Installation of new load center and HVL switches for existing Manufacturing facility
Contractor name as published
Rosendin
Contact
- Phone••• ••• ••••
Data through Oct 25, 2026Source: City of Austin Open Data: Issued Construction Permits
4,291 Permits in the last 30 days, page 50 of 86
Pro shows every Permit back to Jan 1, 2024. Full history
Installation of new load center and HVL switches for existing Manufacturing facility
Rosendin
Irrigation install for landscape areas only
ePlan: Residential Expedited Review - FOUR UNITS: New Construction of 4 MODULAR 3-Story Single Family Res; 2100 Wilson St: New 3-story SF Res [3bed 2.5bath] with attached garage and roof deck
Catalyst ATX
Total demo of detached single-story garage 621 sq ft circa 1971 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
Friedman General Contracting (**Main**)
Upgrade main service to 350amps
Allison Electric
ePlan: Residential Expedited Review - New THREE UNIT RES. Bldg 3: New construction of a 2-Story Single Family Res. [4bed 3bath] with Attached Garage. 6401 Arnold Dr.
A Plus PCS Plumbing Co
Replacement of an existing water heater 50gal gas located in a utility closet
Stan's Heating, Air, & Plumbing
Total demo of sfr 1212 sqft circa 1953
Local Plumbing Service-DBA Crow's Plumbing Service
Express: Replace 4 windows (like for like)
Home Depot USA Inc
T-pole Install Ref: 2026-118436 BP
BFC Electrical Services
ETJ. Irrigation for lawn.
New irrigation system
ePlan: Residential Expedited Review - Addition and Remodel to Existing Single Family Res. work to include 2nd floor addition to existing 1-story Sf res (all within existing roofline) remodel of kitchen/living space & laundry
AEI Electric LLC
Total demo of SFR 3334 SqFt circa 1970
Joseph Design Build**MAIN***
Interior Remodel and Garage Conversion- remove walls to open floorplan. Replace flooring and interior design. Enclose part of garage for laundry. Replace windows and doors.
Top Tier Electric
ePlan: Residential Expedited Review - New Construction of 2-Story SF Res [4bed 3.5bath] with basement and attached garage
G & R Lone Star Plumbing
ETJ- New Construction of SFR
IES Residential, Inc.
Full tear-off of existing roofing to structural deck (like-for-like reroof). Install fully adhered 60-mil TPO membrane over two layers 2.2 polyiso insulation (4.4 R-25.2 min). Flash RTU curbs/penetrations; ES-1 perimeter metal. No structural MEP or footprint changes.
Ava's Construction, LLC
Construct new driveway approach of 17 FT
Need to replace weatherhead that was knocked off by tree
BAE Electric, LLC
Construct new driveway approach of 12 FT and 16 LF of Curb/Gutter.
Topos Collective
gas test to eventually connect gas to meter .
Fairway Plumbing LLC
Interior renovation of a two-story multi-family building. Convert existing tubs to showers replace all existing counter tops cabinets and fixtures and equipment with new. Replace all existing gypsum boards with new. Replace all existing doors with new in existing multifamily.
CROSS COUNTRY PLUMBING INC.
New 1 story SFR with 4 beds 4.5 baths 2 car garage front covered porch and rear covered patio
Airstrike HVAC, LLC
Replacing a 150 amp disconnect like for like. Burnt up busbar
Trutec Electric
New 2-story dwelling unit 1 bathroom with kitchen and loft
SANC Electric LLC
Construct new driveway approach of 18 FT. No sidewalk inspection per plan review.
Stone Acorn Builders
Relocation of CLIA Rm 124 to Pharmacy/vaccine/CLIA Rm 126 with new cabinetry. Existing Rm 124 will be repurposed as a Sterilization Rm with negative pressure.
People to People Plumbing
Replacement of an existing water heater REPLACING GAS TANKLESS OUTDOOR WATER HEATER LIKE FOR LIKE
Benjamin Franklin Plumbing
Addition/Remodel - Retro permit for removing exterior landing/steps planters interior remodel to convert existing unfinished basement to a game room. New doors and windows new interior staircase (deferred structural plans)
Hattery Inc.
Emergency Gas Line Repair Approx. 10 ft Replace old piping
ABC Home & Commercial Service
ETJ. Irrigation for lawn
ePlan: Residential Expedited Review - Three Unit Unit1A New construction of 3-Story Single Family Res [5bed 4.5bath]
JPI Electric of Texas LLC
100amp weatherhead and service entrance conductor replacement ground rods and interested bridge install.
Mister Sparky Austin
Landing Repair At Rear Of Building 8559. Like For Like Replacement Of Aged Materials
Foundation Specialists, Inc
Need a 30 foot tunnel to be dug on the right side of the house to replace yard line from home to city connection.
Reliant Plumbing
replacing water service line from meter to home 30 ft
TruePoint Leak Detection LLC
ETJ Disconnect to Reconnect Required Repair damaged electrical service mast.
Amigos Electric
EXPRESS: Main House demo kitchen and bath to determine necessary repairs needed and utility upgrades
James Nolan Construction, LLC
TEMPORARY ELECTRICAL PERMIT - Electrical underground work associated with the foundations for the Factory building for Project Toaster.
MMR Constructors, Inc.
2104 Wilson St: New 3-story SF Res [3bed 2.5bath] with attached garage and rooftop deck
Catalyst ATX
ePlan: Commercial Expedited Review Interior Remodel to Parking Garage for New Mechanical Room to be used for Chilling Units to Serve Building 2 Lab No Access Control No Plumbing (363566 SF)
Beckett Electrical Services
Replacement of complete existing central heat and air system with or without duct work 1 system: 3 Ton 18 Seer2 Variable Speed Heat Pump Side Discharge Condenser evaporator coil and gas furnace
Salt Light & Electric
Interior tenant build-out of an existing vacant restaurant space for a Firehouse Subs quick-service restaurant; includes architectural MEP kitchen equipment and finishes.
AUSTIN COMMERCIAL CONSTRUCTION
Landing Repair At Building 8505 By Unit 1010. Like For Like Replacement Of Aged Materials
Foundation Specialists, Inc
New construction of 2-story single family dwelling with 4 bedrooms and 3.5 baths 2 car garage rear patio and front porch PUD
Victory Plumbing Company
Install generator
McCrady Electric, Inc.
Installation of EV Chargers - Park and charge site.
Gordon Highlander
New construction of 2 story single family dwelling with 4 bedrooms and 3.5 baths 2 car garage rear patio and front porch PUD
Victory Plumbing Company
Tpole install
BFC Electrical Services
| Issue date | Permit type | Address | ZIP | Declared value | Description | Contractor name as published | Follow-on work | Contact |
|---|---|---|---|---|---|---|---|---|
| Oct 8, 2026 | Electrical | 3501 ED BLUESTEIN BLVD NB BLDG U | 78725 | No value stated | Installation of new load center and HVL switches for existing Manufacturing facility | Rosendin |
| |
| Oct 8, 2026 | Plumbing | 2208 S 3RD ST | 78704 | No value stated | Irrigation install for landscape areas only | |||
| Oct 8, 2026 | New construction | 2100 WILSON ST | 78704 | $0 | ePlan: Residential Expedited Review - FOUR UNITS: New Construction of 4 MODULAR 3-Story Single Family Res; 2100 Wilson St: New 3-story SF Res [3bed 2.5bath] with attached garage and roof deck | Catalyst ATX |
|
|
| Oct 8, 2026 | Demolition | 2811 ROCK TERRACE DR | 78704 | $0 | Total demo of detached single-story garage 621 sq ft circa 1971 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.*** | Friedman General Contracting (**Main**) |
|
|
| Oct 8, 2026 | Electrical | 1912 W 35TH ST | 78731 | No value stated | Upgrade main service to 350amps | Allison Electric |
| |
| Oct 8, 2026 | Plumbing | 6401 ARNOLD DR | 78723 | No value stated | ePlan: Residential Expedited Review - New THREE UNIT RES. Bldg 3: New construction of a 2-Story Single Family Res. [4bed 3bath] with Attached Garage. 6401 Arnold Dr. | A Plus PCS Plumbing Co |
| |
| Oct 8, 2026 | Plumbing | 7003 WOODHUE DR BLDG B | 78745 | No value stated | Replacement of an existing water heater 50gal gas located in a utility closet | Stan's Heating, Air, & Plumbing |
| |
| Oct 8, 2026 | Plumbing | 4710 FINLEY DR | 78731 | No value stated | Total demo of sfr 1212 sqft circa 1953 | Local Plumbing Service-DBA Crow's Plumbing Service |
| |
| Oct 8, 2026 | Building Permit / Repair / R- 435 Renovations/Remodel | 7709 JABORANDI DR | 78739 | $1 | Express: Replace 4 windows (like for like) | Home Depot USA Inc |
| |
| Oct 8, 2026 | Electrical | 4305 HANK AVE | 78745 | No value stated | T-pole Install Ref: 2026-118436 BP | BFC Electrical Services |
| |
| Oct 8, 2026 | Plumbing | 13312 PARSONS PRAIRIE LN | 78610 | No value stated | ETJ. Irrigation for lawn. | |||
| Oct 8, 2026 | Plumbing | 3105 1/2 LITTLE DON DR | 78660 | No value stated | New irrigation system | |||
| Oct 8, 2026 | Electrical | 3325 AZALEA BLOSSOM DR | 78748 | No value stated | ePlan: Residential Expedited Review - Addition and Remodel to Existing Single Family Res. work to include 2nd floor addition to existing 1-story Sf res (all within existing roofline) remodel of kitchen/living space & laundry | AEI Electric LLC |
| |
| Oct 8, 2026 | Demolition | 1604 VALLEYRIDGE DR | 78704 | $0 | Total demo of SFR 3334 SqFt circa 1970 | Joseph Design Build**MAIN*** |
|
|
| Oct 8, 2026 | Electrical | 11405 HORNSBY ST | 78753 | No value stated | Interior Remodel and Garage Conversion- remove walls to open floorplan. Replace flooring and interior design. Enclose part of garage for laundry. Replace windows and doors. | Top Tier Electric |
| |
| Oct 8, 2026 | Plumbing | 2609 DEERFOOT TRL | 78704 | No value stated | ePlan: Residential Expedited Review - New Construction of 2-Story SF Res [4bed 3.5bath] with basement and attached garage | G & R Lone Star Plumbing |
| |
| Oct 8, 2026 | Electrical | 13506 RIDING DR | 78660 | No value stated | ETJ- New Construction of SFR | IES Residential, Inc. |
| |
| Oct 8, 2026 | Remodel | 701 W NORTH LOOP BLVD | 78751 | No value stated | Full tear-off of existing roofing to structural deck (like-for-like reroof). Install fully adhered 60-mil TPO membrane over two layers 2.2 polyiso insulation (4.4 R-25.2 min). Flash RTU curbs/penetrations; ES-1 perimeter metal. No structural MEP or footprint changes. | Ava's Construction, LLC |
| |
| Oct 8, 2026 | Driveway / Sidewalks / New / Res. Driveway | 5200 GLISSMAN RD | 78702 | No value stated | Construct new driveway approach of 17 FT | |||
| Oct 8, 2026 | Electrical | 4808 WESTFIELD DR | 78731 | No value stated | Need to replace weatherhead that was knocked off by tree | BAE Electric, LLC |
| |
| Oct 8, 2026 | Driveway / Sidewalks / New / Res. Driveway, Curb, Gutter | 901 SHADY LN | 78702 | No value stated | Construct new driveway approach of 12 FT and 16 LF of Curb/Gutter. | Topos Collective |
| |
| Oct 8, 2026 | Plumbing | 6913 BRYN MAWR DR | 78723 | No value stated | gas test to eventually connect gas to meter . | Fairway Plumbing LLC |
| |
| Oct 8, 2026 | Plumbing | 1105 CLAYTON LN UNIT 201 | 78723 | No value stated | Interior renovation of a two-story multi-family building. Convert existing tubs to showers replace all existing counter tops cabinets and fixtures and equipment with new. Replace all existing gypsum boards with new. Replace all existing doors with new in existing multifamily. | CROSS COUNTRY PLUMBING INC. |
| |
| Oct 8, 2026 | HVAC | 12009 BITTERN HOLW | 78758 | No value stated | New 1 story SFR with 4 beds 4.5 baths 2 car garage front covered porch and rear covered patio | Airstrike HVAC, LLC |
| |
| Oct 8, 2026 | Electrical | 1411 TOWN CREEK DR UNIT 1 | 78741 | No value stated | Replacing a 150 amp disconnect like for like. Burnt up busbar | Trutec Electric |
| |
| Oct 8, 2026 | Electrical | 2217 IVA LN | 78704 | No value stated | New 2-story dwelling unit 1 bathroom with kitchen and loft | SANC Electric LLC |
| |
| Oct 8, 2026 | Driveway / Sidewalks / New / Res. Driveway | 2821 SALADO ST | 78705 | No value stated | Construct new driveway approach of 18 FT. No sidewalk inspection per plan review. | Stone Acorn Builders |
| |
| Oct 8, 2026 | Plumbing | 2802 WEBBERVILLE RD | 78702 | No value stated | Relocation of CLIA Rm 124 to Pharmacy/vaccine/CLIA Rm 126 with new cabinetry. Existing Rm 124 will be repurposed as a Sterilization Rm with negative pressure. | People to People Plumbing |
| |
| Oct 8, 2026 | Plumbing | 7516 HARDY DR | 78757 | No value stated | Replacement of an existing water heater REPLACING GAS TANKLESS OUTDOOR WATER HEATER LIKE FOR LIKE | Benjamin Franklin Plumbing |
| |
| Oct 8, 2026 | Plumbing | 4805 PRECIPICE CV | 78731 | No value stated | Addition/Remodel - Retro permit for removing exterior landing/steps planters interior remodel to convert existing unfinished basement to a game room. New doors and windows new interior staircase (deferred structural plans) | Hattery Inc. |
| |
| Oct 8, 2026 | Plumbing | 1701 ALAMEDA DR | 78704 | No value stated | Emergency Gas Line Repair Approx. 10 ft Replace old piping | ABC Home & Commercial Service |
| |
| Oct 8, 2026 | Plumbing | 13306 PARSONS PRAIRIE LN | 78610 | No value stated | ETJ. Irrigation for lawn | |||
| Oct 8, 2026 | Electrical | 1911 ROBBINS PL UNIT 1A | 78705 | No value stated | ePlan: Residential Expedited Review - Three Unit Unit1A New construction of 3-Story Single Family Res [5bed 4.5bath] | JPI Electric of Texas LLC |
| |
| Oct 8, 2026 | Electrical | 6811 LANGSTON DR | 78723 | No value stated | 100amp weatherhead and service entrance conductor replacement ground rods and interested bridge install. | Mister Sparky Austin |
| |
| Oct 8, 2026 | Remodel | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8559 | 78759 | No value stated | Landing Repair At Rear Of Building 8559. Like For Like Replacement Of Aged Materials | Foundation Specialists, Inc |
| |
| Oct 8, 2026 | Plumbing | 3108 MATADOR DR | 78741 | No value stated | Need a 30 foot tunnel to be dug on the right side of the house to replace yard line from home to city connection. | Reliant Plumbing |
| |
| Oct 8, 2026 | Plumbing | 2907 VILLAGE DR | 78731 | No value stated | replacing water service line from meter to home 30 ft | TruePoint Leak Detection LLC |
| |
| Oct 8, 2026 | Electrical | 10412 FM 969 RD | 78724 | No value stated | ETJ Disconnect to Reconnect Required Repair damaged electrical service mast. | Amigos Electric |
| |
| Oct 8, 2026 | Building Permit / Repair / R- 435 Renovations/Remodel | 5004 AVENUE G | 78751 | $1 | EXPRESS: Main House demo kitchen and bath to determine necessary repairs needed and utility upgrades | James Nolan Construction, LLC |
| |
| Oct 8, 2026 | Electrical | 475 PATTON AVE | 78742 | No value stated | TEMPORARY ELECTRICAL PERMIT - Electrical underground work associated with the foundations for the Factory building for Project Toaster. | MMR Constructors, Inc. |
| |
| Oct 8, 2026 | New construction | 2104 WILSON ST | 78704 | $0 | 2104 Wilson St: New 3-story SF Res [3bed 2.5bath] with attached garage and rooftop deck | Catalyst ATX |
|
|
| Oct 8, 2026 | Electrical | 5707 SOUTHWEST PKWY BLDG GAR | 78735 | No value stated | ePlan: Commercial Expedited Review Interior Remodel to Parking Garage for New Mechanical Room to be used for Chilling Units to Serve Building 2 Lab No Access Control No Plumbing (363566 SF) | Beckett Electrical Services |
| |
| Oct 8, 2026 | HVAC | 6902 IDEA RD | 78741 | No value stated | Replacement of complete existing central heat and air system with or without duct work 1 system: 3 Ton 18 Seer2 Variable Speed Heat Pump Side Discharge Condenser evaporator coil and gas furnace | Salt Light & Electric |
| |
| Oct 8, 2026 | Remodel | 1200 BARBARA JORDAN BLVD UNIT 340 | 78723 | No value stated | Interior tenant build-out of an existing vacant restaurant space for a Firehouse Subs quick-service restaurant; includes architectural MEP kitchen equipment and finishes. | AUSTIN COMMERCIAL CONSTRUCTION |
| |
| Oct 8, 2026 | Remodel | 8527 N CAPITAL OF TEXAS HWY NB BLDG 8505 | 78759 | No value stated | Landing Repair At Building 8505 By Unit 1010. Like For Like Replacement Of Aged Materials | Foundation Specialists, Inc |
| |
| Oct 8, 2026 | Plumbing | 7301 STITZEL WELLER DR | 78744 | No value stated | New construction of 2-story single family dwelling with 4 bedrooms and 3.5 baths 2 car garage rear patio and front porch PUD | Victory Plumbing Company |
| |
| Oct 8, 2026 | Electrical | 3713 WINDSOR RD | 78703 | No value stated | Install generator | McCrady Electric, Inc. |
| |
| Oct 8, 2026 | Building Permit / New / C- 329 Com Structures Other Than Bldg | 405 E ST ELMO RD | 78745 | $2,100,000 | Installation of EV Chargers - Park and charge site. | Gordon Highlander |
| |
| Oct 8, 2026 | Plumbing | 8102 ELIJAH CRAIG WAY | 78744 | No value stated | New construction of 2 story single family dwelling with 4 bedrooms and 3.5 baths 2 car garage rear patio and front porch PUD | Victory Plumbing Company |
| |
| Oct 8, 2026 | Electrical | 2200 E 18TH ST | 78702 | No value stated | Tpole install | BFC Electrical Services |
|