Gas leak repair
Dallas building permits
Data through Oct 25, 2026Source: Dallas OpenData: Building Permits
Dallas in the last 30 days
- Permits issued
- 5,173
- Newest Permit
- Oct 25, 2026
- Plumbing1438
- Electrical1116
- HVAC688
- Remodel641
- New construction384
- 75229331
- 75214272
- 75206216
- 75230216
- 75248203
- ALEJANDRO COMPIAN R.M.P9
- ABLE CRAFT GENERAL CONTRACTOR LLC1
- SPRING VALLEY CONSTRUCTION CO.1
Permits
5,173 Permits in the last 30 days, page 10 of 104
Pro shows every Permit back to Jan 1, 2024. Full history
DON'T PROCESS SITE WORK - Construction of a new single-story, freestanding Fifth Third Bank with a structural steel frame measuring 49'-10" × 62'-6". The development includes drive-through banking services and an enclosed trash facility. Exterior materials - including Slate Gray Brick, Dover Sky Stucco, Metal panels, and matching coping.
DON'T PROCESS NEW CONSTRUCTION - Construction of a new single-story, freestanding Fifth Third Bank with a structural steel frame measuring 49'-10" × 62'-6". The development includes drive-through banking services and an enclosed trash facility. Exterior materials - including Slate Gray Brick, Dover Sky Stucco, Metal panels, and matching coping.
1-8 UNIT Consolidated dwelling 1-8 unit ** to be reviewed by COM-Zo & Res-BU
QTEAM INHOUSE Electrical upgrade for Suite 200
1-8 UNIT Consolidated dwelling 1-8 unit ** to be reviewed by COM-Zo & Res-BU
QTEAM INHOUSE First time finish out for spec office
QTEAM INHOUSE Upgraded electrical service for Suite 190
QTEAM INHOUSE First Time finish out for Spec Office
CONSTRUCTION OF A NEW 1-STORY FREESTANDING EMERGENCY DEPARTMENT IN DALLAS, TEXAS. THE FACILITY IS 11,150 SF AND CONSISTS OF (10) EXAM ROOMS, (1) RESUSCITATION ROOM, (1) TRIAGE ROOM, (1) CT SCAN ROOM, (1) X-RAY ROOM AND ASSOCIATED SUPPORT SPACES. ON-SITE PROVISIONS INCLUDE A PUBLIC DROP-OFF CANOPY, AN AMBULANCE DROP-OFF CANOPY, A DECONTAMINATION ROOM CANOPY, AND A GENERATOR/DUMPSTER ENCLOSURE.
Install 5 ton RTU(gas) with ductwork
Relocate existing supply grilles and exhaust fan with related ductwork for new ceiling
New grills for existing supply/return runs for new ceiling
Relocate grilles with related ductwork for new ceiling, provide new grills for existing runs for new ceiling, demo exhaust fan related ductwork and cap
install 1 split system and one Ef
Installing a York, 4-Ton, Upflow HVAC system.
5 ton packaged unitrun ductwork
Remove and replace two 15ton package units with like for like replacements.
Wire Addition/Remodel
New construction build out of building operations area on Level 3 of a new 4 story data center.
New construction build out of administrative area on Level 3 of a new 4 story data center.
New construction build out of data halls and electrical rooms on Level 2 of a new 4 story data center
Remodel current retail space into a Boxing gym
New construction build out of operations area on Level 2 of a new 4 story data center.
ALL ELECTRICAL WIRING AND INSTALLATION
Electrical renovations in break room and lobby- relocation of outlets and replacement of light fixtures
New construction build out of administrative area on Level 2 of a new 4 story data center.
Remodel Instructional Dance Studio
New construction build out of Data Halls and Electrical Rooms on Level 1 of a new 4 story data center.67,000 sq ft
This is a service entrance upgrade from 200 amps to 600 amps with 3 meter sockets and 2 new electrical panels.
Interior remodel of existing 1619 sq ft space of personal service/massage establishment.They are adding five new treatment rooms non-loadbearing with two receptacles and a wall light in each.Also to relocate washer and dryer connections.
electrical remodel
Electrical remodel, installing lights, outlets, and switches.
Electric Release no work
Customer is upgrading electrical system to 1200A service.
Electrical remodel, installing lights, outlets, and switches. Phase 4
Electrical remodel, installing lights, outlets, switches.
Electrical Remodel installing lights, outlets, and switches Phase 2
Electrical remodel install lights, outlets, and switches Phase 1
relocation ofthe existing electrical panels andtransformer from the former electricalroom located within the area that isbeing converted from Coworkers toFerguson.Per John’s direction the existingelectrical equipment will be relocatedto the vestibule outside of Ferguson’sleased space. Once relocated, theelectrical system will be reconnected toprovide power to the remaining tenantspace, including the mezzanine.The scope also includes rerouting theelectrical feeds for the two existingrooftop HVAC units (RTUs) thatcurrently receive power fromFerguson’s existing electrical panels.These circuits will be reconnected tothe relocated panels to maintainoperation of the remaining tenantspace.
DISCONNECT AND RECONNECT NEW FIRE PUMP CONTROL CABINET. WILL REQUIRED COURTESY DISCONNECT AND RECONNECT.
Non-Work Electrical permit to re-energize building
Outlets and office lighting
Upgrade electrical service and panel.
no work performed/ need release
Clean & Show
Service Release No work. Vacant Space **This permit authorizes work only for the approved trade. Construction, erection, or alteration of any structure will require a separate permit and may require additional trade permits.**
Electric Release no work
Demolish building 1 due to fire.Refer to previous demo permit request COM-DEM-26-000172 requesting to cancel previous request for alteration permit: COM-ALT-ADD-26-002321. I previously requested alteration permit p/Hile in alteration he stated since building isn't attach request Demolition. Requested and was told I needed to have the alteration permit canceled. That has also been completed.
Complete demolition of an existing one-story commercial restaurant building located at the southwest corner of Monticello Avenue and McKinney Avenue, Dallas, TX, including removal of the building structure, foundation, and slab-on-grade to finished grade. Work includes disconnection and capping of interior utilities in coordination with franchise utility companies, removal of associated site improvements per the accompanying civil demolition plan, and site restoration/rough grading following building removal.
| Issue date | Permit type | Address | ZIP | Declared value | Description | Contractor name as published | Follow-on work | Contact |
|---|---|---|---|---|---|---|---|---|
| Oct 22, 2026 | Plumbing | 13655 PRESTON RD | 75240 | No value stated | Gas leak repair | |||
| Oct 22, 2026 | New construction | 7650 SAMUELL BLVD | 75227 | No value stated | DON'T PROCESS SITE WORK - Construction of a new single-story, freestanding Fifth Third Bank with a structural steel frame measuring 49'-10" × 62'-6". The development includes drive-through banking services and an enclosed trash facility. Exterior materials - including Slate Gray Brick, Dover Sky Stucco, Metal panels, and matching coping. | |||
| Oct 22, 2026 | New construction | 7650 SAMUELL BLVD | 75227 | No value stated | DON'T PROCESS NEW CONSTRUCTION - Construction of a new single-story, freestanding Fifth Third Bank with a structural steel frame measuring 49'-10" × 62'-6". The development includes drive-through banking services and an enclosed trash facility. Exterior materials - including Slate Gray Brick, Dover Sky Stucco, Metal panels, and matching coping. | |||
| Oct 22, 2026 | New construction | 4937 ALTON AVE | 75214 | No value stated | 1-8 UNIT Consolidated dwelling 1-8 unit ** to be reviewed by COM-Zo & Res-BU | |||
| Oct 22, 2026 | New construction | 10865 MILLER RD | 75238 | No value stated | QTEAM INHOUSE Electrical upgrade for Suite 200 | |||
| Oct 22, 2026 | New construction | 4933 ALTON AVE | 75214 | No value stated | 1-8 UNIT Consolidated dwelling 1-8 unit ** to be reviewed by COM-Zo & Res-BU | |||
| Oct 22, 2026 | New construction | 10855 MILLER RD | 75238 | No value stated | QTEAM INHOUSE First time finish out for spec office | |||
| Oct 22, 2026 | New construction | 10855 MILLER RD | 75238 | No value stated | QTEAM INHOUSE Upgraded electrical service for Suite 190 | |||
| Oct 22, 2026 | New construction | 10851 MILLER RD | 75238 | No value stated | QTEAM INHOUSE First Time finish out for Spec Office | |||
| Oct 22, 2026 | New construction | 13508 C F HAWN FWY, Dallas, TX | No value stated | CONSTRUCTION OF A NEW 1-STORY FREESTANDING EMERGENCY DEPARTMENT IN DALLAS, TEXAS. THE FACILITY IS 11,150 SF AND CONSISTS OF (10) EXAM ROOMS, (1) RESUSCITATION ROOM, (1) TRIAGE ROOM, (1) CT SCAN ROOM, (1) X-RAY ROOM AND ASSOCIATED SUPPORT SPACES. ON-SITE PROVISIONS INCLUDE A PUBLIC DROP-OFF CANOPY, AN AMBULANCE DROP-OFF CANOPY, A DECONTAMINATION ROOM CANOPY, AND A GENERATOR/DUMPSTER ENCLOSURE. | ||||
| Oct 22, 2026 | HVAC | 512 S RIVERFRONT BLVD | 75207 | No value stated | Install 5 ton RTU(gas) with ductwork | |||
| Oct 22, 2026 | HVAC | 4023 OAK LAWN AVE | 75219 | No value stated | Relocate existing supply grilles and exhaust fan with related ductwork for new ceiling | |||
| Oct 22, 2026 | HVAC | 4023 OAK LAWN AVE | 75219 | No value stated | New grills for existing supply/return runs for new ceiling | |||
| Oct 22, 2026 | HVAC | 4023 OAK LAWN AVE | 75219 | No value stated | Relocate grilles with related ductwork for new ceiling, provide new grills for existing runs for new ceiling, demo exhaust fan related ductwork and cap | |||
| Oct 22, 2026 | HVAC | 8521 N CENTRAL EXPY | 75225 | No value stated | install 1 split system and one Ef | |||
| Oct 22, 2026 | HVAC | 2703 CANTON ST | 75220 | No value stated | Installing a York, 4-Ton, Upflow HVAC system. | |||
| Oct 22, 2026 | HVAC | 8601 SOVEREIGN ROW | 75247 | No value stated | 5 ton packaged unitrun ductwork | |||
| Oct 22, 2026 | HVAC | 6300 SKILLMAN ST | 75231 | No value stated | Remove and replace two 15ton package units with like for like replacements. | |||
| Oct 22, 2026 | Electrical | 2264 VANTAGE ST | 75207 | No value stated | Wire Addition/Remodel | |||
| Oct 22, 2026 | Electrical | 1550 W MOCKINGBIRD LN | 75235 | No value stated | New construction build out of building operations area on Level 3 of a new 4 story data center. | |||
| Oct 22, 2026 | Electrical | 1550 W MOCKINGBIRD LN | 75235 | No value stated | New construction build out of administrative area on Level 3 of a new 4 story data center. | |||
| Oct 22, 2026 | Electrical | 1550 W MOCKINGBIRD LN | 75235 | No value stated | New construction build out of data halls and electrical rooms on Level 2 of a new 4 story data center | |||
| Oct 22, 2026 | Electrical | 512 S RIVERFRONT BLVD | 75207 | No value stated | Remodel current retail space into a Boxing gym | |||
| Oct 22, 2026 | Electrical | 1550 W MOCKINGBIRD LN | 75235 | No value stated | New construction build out of operations area on Level 2 of a new 4 story data center. | |||
| Oct 22, 2026 | Electrical | 1400 W COMMERCE ST | 75208 | No value stated | ALL ELECTRICAL WIRING AND INSTALLATION | |||
| Oct 22, 2026 | Electrical | 2501 N HARWOOD ST | 75201 | No value stated | Electrical renovations in break room and lobby- relocation of outlets and replacement of light fixtures | |||
| Oct 22, 2026 | Electrical | 1550 W MOCKINGBIRD LN | 75235 | No value stated | New construction build out of administrative area on Level 2 of a new 4 story data center. | |||
| Oct 22, 2026 | Electrical | 6959 ARAPAHO RD | 75248 | No value stated | Remodel Instructional Dance Studio | |||
| Oct 22, 2026 | Electrical | 1550 W MOCKINGBIRD LN | 75235 | No value stated | New construction build out of Data Halls and Electrical Rooms on Level 1 of a new 4 story data center.67,000 sq ft | |||
| Oct 22, 2026 | Electrical | 2674 MYRTLE SPRINGS AVE | 75220 | No value stated | This is a service entrance upgrade from 200 amps to 600 amps with 3 meter sockets and 2 new electrical panels. | |||
| Oct 22, 2026 | Electrical | 6780 ABRAMS RD | 75231 | No value stated | Interior remodel of existing 1619 sq ft space of personal service/massage establishment.They are adding five new treatment rooms non-loadbearing with two receptacles and a wall light in each.Also to relocate washer and dryer connections. | |||
| Oct 22, 2026 | Electrical | 12712 PARK CENTRAL DR | 75251 | No value stated | electrical remodel | |||
| Oct 22, 2026 | Electrical | 4023 OAK LAWN AVE | 75219 | No value stated | Electrical remodel, installing lights, outlets, and switches. | |||
| Oct 22, 2026 | Electrical | 3410 FORDHAM RD | 75216 | No value stated | Electric Release no work | |||
| Oct 22, 2026 | Electrical | 10510 MARKISON RD | 75238 | No value stated | Customer is upgrading electrical system to 1200A service. | |||
| Oct 22, 2026 | Electrical | 4023 OAK LAWN AVE | 75219 | No value stated | Electrical remodel, installing lights, outlets, and switches. Phase 4 | |||
| Oct 22, 2026 | Electrical | 4023 OAK LAWN AVE | 75219 | No value stated | Electrical remodel, installing lights, outlets, switches. | |||
| Oct 22, 2026 | Electrical | 4023 OAK LAWN AVE | 75219 | No value stated | Electrical Remodel installing lights, outlets, and switches Phase 2 | |||
| Oct 22, 2026 | Electrical | 4023 OAK LAWN AVE | 75219 | No value stated | Electrical remodel install lights, outlets, and switches Phase 1 | |||
| Oct 22, 2026 | Electrical | 1500 DRAGON ST | 75207 | No value stated | relocation ofthe existing electrical panels andtransformer from the former electricalroom located within the area that isbeing converted from Coworkers toFerguson.Per John’s direction the existingelectrical equipment will be relocatedto the vestibule outside of Ferguson’sleased space. Once relocated, theelectrical system will be reconnected toprovide power to the remaining tenantspace, including the mezzanine.The scope also includes rerouting theelectrical feeds for the two existingrooftop HVAC units (RTUs) thatcurrently receive power fromFerguson’s existing electrical panels.These circuits will be reconnected tothe relocated panels to maintainoperation of the remaining tenantspace. | |||
| Oct 22, 2026 | Electrical | 3900 JUNIUS ST | 75246 | No value stated | DISCONNECT AND RECONNECT NEW FIRE PUMP CONTROL CABINET. WILL REQUIRED COURTESY DISCONNECT AND RECONNECT. | |||
| Oct 22, 2026 | Electrical | 1925 MOSER AVE | 75206 | No value stated | Non-Work Electrical permit to re-energize building | |||
| Oct 22, 2026 | Electrical | 17950 PRESTON RD | 75252 | No value stated | Outlets and office lighting | |||
| Oct 22, 2026 | Electrical | 2026 W CLARENDON DR | 75208 | No value stated | Upgrade electrical service and panel. | |||
| Oct 22, 2026 | Electrical | 7460 CHESTERFIELD DR | 75237 | No value stated | no work performed/ need release | |||
| Oct 22, 2026 | Electrical | 10317 CAYUGA DR | 75228 | No value stated | Clean & Show | |||
| Oct 22, 2026 | Electrical | 2943 S BUCKNER BLVD | 75227 | No value stated | Service Release No work. Vacant Space **This permit authorizes work only for the approved trade. Construction, erection, or alteration of any structure will require a separate permit and may require additional trade permits.** | |||
| Oct 22, 2026 | Electrical | 2025 FARRINGTON ST | 75207 | No value stated | Electric Release no work | |||
| Oct 22, 2026 | Demolition | 11490 AUDELIA RD | 75243 | No value stated | Demolish building 1 due to fire.Refer to previous demo permit request COM-DEM-26-000172 requesting to cancel previous request for alteration permit: COM-ALT-ADD-26-002321. I previously requested alteration permit p/Hile in alteration he stated since building isn't attach request Demolition. Requested and was told I needed to have the alteration permit canceled. That has also been completed. | |||
| Oct 22, 2026 | Demolition | 4829 MCKINNEY AVE | 75205 | No value stated | Complete demolition of an existing one-story commercial restaurant building located at the southwest corner of Monticello Avenue and McKinney Avenue, Dallas, TX, including removal of the building structure, foundation, and slab-on-grade to finished grade. Work includes disconnection and capping of interior utilities in coordination with franchise utility companies, removal of associated site improvements per the accompanying civil demolition plan, and site restoration/rough grading following building removal. |