Construct approx. 575lf of new walls to expand and remodel existing office pods. Install R19 insulation from 10' AFF to deck throughout warehouse. AC warehouse, new lighting throughout warehouse, provide power for equipment, roof in new HVAC Units.
Dallas building permits
Data through Oct 25, 2026Source: Dallas OpenData: Building Permits
Dallas in the last 30 days
- Permits issued
- 5,173
- Newest Permit
- Oct 25, 2026
- Plumbing1438
- Electrical1116
- HVAC688
- Remodel641
- New construction384
- 75229331
- 75214272
- 75206216
- 75230216
- 75248203
- ALEJANDRO COMPIAN R.M.P9
- ABLE CRAFT GENERAL CONTRACTOR LLC1
- SPRING VALLEY CONSTRUCTION CO.1
Permits
5,173 Permits in the last 30 days, page 18 of 104
Pro shows every Permit back to Jan 1, 2024. Full history
We will remove the smoke compartment wall between rooms B2.32 and B2.31 to make 1 smoke compartment. We will also remove (2) duct detectors.
Steel and fabric shade installation over existing basketball court
Building a temporary stage for Fall Festival. It will be up only a few days. Once Festival is over it will be dismantled.
QTEAM INHOUSE - COMBINING SUITE 1200 WITH 1400 TO CREATE A SPEAKEASY ROOM
Installation of four temporary platform stages for the amfAR 2026 Dallas special event, to be held Saturday, October 24, 2026, at 4710 Dorset Rd, Dallas, TX. The stages are temporary structures for the duration of the event only, and no permanent alterations or additions will be made to the building or site. The stages are as follows:Platform Stage 1: 12 ft x 28 ft, 24 inches off the groundPlatform Stage 2: 20 ft x 8 ft, 24 inches off the groundPlatform Stage 3: 12 ft x 4 ft, 30 inches off the groundPlatform Stage 4: 16 ft x 8 ft, 24 inches off the groundAll four platforms will be assembled on site by Beyond Productions using modular stage decking. Each stage will be covered in fire-retardant carpet.Installation will begin Wednesday, October 21, 2026, with the event on Saturday, October 24, and dismantling and load-out completed by Wednesday, October 28. All structures will be fully removed after the event.
MCR Removing a wall from the front of the store to make the sales area bigger, there is no electricity inside that wall and its not connecting to the ceiling
MCR Commercial Interior Office Renovation and expansion of existing Suite 305. Minor demolition to expand suite into adjacent suite. New walls, new finishes, new electrical outlets, new lighting. No plumbing, HVAC, Fire Sprinkler, Fire Alarm needed for this renovation.
MCR remodel of existing space for office space tenant. Offices, conference room, break room and IT all included
QTEAM INHOUSE remodel - dividing building into 2 suites, and white box of both suites
QTEAM INHOUSE Renovation of existing space for Bi-Plane medical imaging equipment. No change to type of building
MCR Tenant alteration intended for office use.
QTEAM INHOUSE - Interior Remodel. Demo an existing bar (previously served alcohol/mixed drinks) and convert that space into a new coffee and juice bar. The current coffee and juice bar location will then be converted to house the WFMAO program. Project is a two-part relocation that cascades through both spaces.
QTEAM INHOUSE - Modification of an existing Chick-fil-A restaurant to remove the existing drive-thru window and replace it with a full height sliding door. Minor structural, mechanical, and electrical modifications required for drive-thru area. No kitchen equipment or plumbing will be moved or modified. There will be no changes to the site or parking count.
QTEAM INHOUSE - Administrative request to create a new lease suite number (Suite B127) inside an existing warehouse. No construction, no structural changes, and no MEP (Mechanical, Electrical, Plumbing) work being performed. Establishing space for a Certificate of Occupancy.
8ft tall fence installation
MCR Install stone and mortar retaining walls. Max height 4'. Alexan Walnut Hill
Gate Permit: I-635 SIDE ENTRANCE: (1st) 28' wide double swing gate, (Middle) double swing gate 20' opening, (3rd) slide single 28' fire lane. MAPLE RIDGE ENTRANCE: 24'wide opening double swing opening outside, WALNUT HILL ENTRANCE: Entry swings in 24' wide opening, Exit swings out 24'wide opening. Electrical line: 4 dedicated circuit 120v 20 amp
MCR W/BATTERY Install 11.455kw PV system with 29 modules, 1 battery & MPU.
Installing a Grid Tied, Roof Mounted, Solar PV System with a Battery Storage system and Full Home Backup, 3rd Party Plan Review.
Third Party Approved. Installing a 16.095 KW PV system, (1) TESLA INC. 1707000-XX-Y inverter/battery, and (1) TESLA INC. 1807000-XX-Y battery. Also installing (1) SPAN SERVICE PANEL.
MCR W/BATTERY Roof-mounted photovoltaic (PV) solar system with battery storage system for a residential installation. Plans have been reviewed and approved by a qualified third-party plan reviewer in accordance with Texas Local Government Code Chapter 247 (SB 1202), including stamped plans and Letter of Compliance.
Roof Replacement of Laminate Material Type
Follow-on work
- GuttersRule reroof-gutters v1
Re-roof
Follow-on work
- GuttersRule reroof-gutters v1
Full roof replacement
Follow-on work
- GuttersRule reroof-gutters v1
Tear off one roof & replace with a laminated shingle.
Follow-on work
- GuttersRule reroof-gutters v1
Full Roof replacement for house and detached garage
Follow-on work
- GuttersRule reroof-gutters v1
Remove roof down to decking, replace with synthetic felt, self-adhering valley liner, and architectural shingles
Follow-on work
- GuttersRule reroof-gutters v1
Roof replacement
Follow-on work
- GuttersRule reroof-gutters v1
remove and replace all underlayment and shingles
Follow-on work
- GuttersRule reroof-gutters v1
Residential re-roof
Follow-on work
- GuttersRule reroof-gutters v1
MCR Building a new gunite in-ground swimming pool + spa.
Follow-on work
- FenceRule pool-barrier v1
- LandscapingRule pool-site-work v1
MCR New In-Ground 495 SF Concrete Pool and associated equipment and pad
Follow-on work
- FenceRule pool-barrier v1
MCR Pool with spa, turf and pavers
Follow-on work
- FenceRule pool-barrier v1
MCR In-Ground Residential Gunite Swimming Pool
Follow-on work
- FenceRule pool-barrier v1
- LandscapingRule pool-site-work v1
Gas test
Gas Test / Release
lava kit sink toilet
New plumbing
Plumbing
replace 35ft of sewer
NEW PLUMBING SFD
INSTALL NEW PLUMBING FOR NEW HOUSE.
REPLACEMENT OF GAS WATER HEATER
repipe sewer from main house to city easement in back yard
RUN GAS LINES TO POOL HEATER AND 2 FIRE BOWLS.
Follow-on work
- FenceRule pool-barrier v1
Gas line for pool heater
Follow-on work
- FenceRule pool-barrier v1
BRING NEW PLUNBING FOR NEW BUILDING
1. Make accesses in the kitchen, laundry, master bathroom, hall bathroom and front clean outs and tunnel 130’ to replace the existing cast iron with schedule 40 PVC pipe under the existing slab for the master bathroom and (2) hall bathrooms, AC hub drain, powder room, bar sink, laundry room and kitchen to the double clean outs in front of the house.2. Remove (4) water closets to replace flanges and reinstall.3. Replace the existing tub drain with a new PVC drain.4. Hand dig 30’ from the laundry room to the kitchen from the outside to connect to the kitchen drain to the new drain line.5. Anchor plumbing to structural beams as per code.
New Plumbing addition
| Issue date | Permit type | Address | ZIP | Declared value | Description | Contractor name as published | Follow-on work | Contact |
|---|---|---|---|---|---|---|---|---|
| Oct 21, 2026 | Remodel | 10615 SANDEN DR | 75238 | No value stated | Construct approx. 575lf of new walls to expand and remodel existing office pods. Install R19 insulation from 10' AFF to deck throughout warehouse. AC warehouse, new lighting throughout warehouse, provide power for equipment, roof in new HVAC Units. | |||
| Oct 21, 2026 | Remodel | 2222 WELBORN ST | 75219 | No value stated | We will remove the smoke compartment wall between rooms B2.32 and B2.31 to make 1 smoke compartment. We will also remove (2) duct detectors. | |||
| Oct 21, 2026 | Remodel | 9430 INWOOD RD | 75220 | No value stated | Steel and fabric shade installation over existing basketball court | |||
| Oct 21, 2026 | Remodel | 7617 CORTLAND AVE | 75235 | No value stated | Building a temporary stage for Fall Festival. It will be up only a few days. Once Festival is over it will be dismantled. | |||
| Oct 21, 2026 | Remodel | 1910 PACIFIC AVE | 75201 | No value stated | QTEAM INHOUSE - COMBINING SUITE 1200 WITH 1400 TO CREATE A SPEAKEASY ROOM | |||
| Oct 21, 2026 | Remodel | 4802 DORSET RD | 75229 | No value stated | Installation of four temporary platform stages for the amfAR 2026 Dallas special event, to be held Saturday, October 24, 2026, at 4710 Dorset Rd, Dallas, TX. The stages are temporary structures for the duration of the event only, and no permanent alterations or additions will be made to the building or site. The stages are as follows:Platform Stage 1: 12 ft x 28 ft, 24 inches off the groundPlatform Stage 2: 20 ft x 8 ft, 24 inches off the groundPlatform Stage 3: 12 ft x 4 ft, 30 inches off the groundPlatform Stage 4: 16 ft x 8 ft, 24 inches off the groundAll four platforms will be assembled on site by Beyond Productions using modular stage decking. Each stage will be covered in fire-retardant carpet.Installation will begin Wednesday, October 21, 2026, with the event on Saturday, October 24, and dismantling and load-out completed by Wednesday, October 28. All structures will be fully removed after the event. | |||
| Oct 21, 2026 | Remodel | 1015 S HAMPTON RD | 75208 | No value stated | MCR Removing a wall from the front of the store to make the sales area bigger, there is no electricity inside that wall and its not connecting to the ceiling | |||
| Oct 21, 2026 | Remodel | 18333 PRESTON RD | 75252 | No value stated | MCR Commercial Interior Office Renovation and expansion of existing Suite 305. Minor demolition to expand suite into adjacent suite. New walls, new finishes, new electrical outlets, new lighting. No plumbing, HVAC, Fire Sprinkler, Fire Alarm needed for this renovation. | |||
| Oct 21, 2026 | Remodel | 17950 PRESTON RD | 75252 | No value stated | MCR remodel of existing space for office space tenant. Offices, conference room, break room and IT all included | |||
| Oct 21, 2026 | Remodel | 2710 LIVE OAK ST | 75204 | No value stated | QTEAM INHOUSE remodel - dividing building into 2 suites, and white box of both suites | |||
| Oct 21, 2026 | Remodel | 7777 FOREST LN | 75230 | No value stated | QTEAM INHOUSE Renovation of existing space for Bi-Plane medical imaging equipment. No change to type of building | |||
| Oct 21, 2026 | Remodel | 3963 MAPLE AVE | 75219 | No value stated | MCR Tenant alteration intended for office use. | |||
| Oct 21, 2026 | Remodel | 2510 MCKINNEY AVE | 75201 | No value stated | QTEAM INHOUSE - Interior Remodel. Demo an existing bar (previously served alcohol/mixed drinks) and convert that space into a new coffee and juice bar. The current coffee and juice bar location will then be converted to house the WFMAO program. Project is a two-part relocation that cascades through both spaces. | |||
| Oct 21, 2026 | Remodel | 2429 W WHEATLAND RD | 75237 | No value stated | QTEAM INHOUSE - Modification of an existing Chick-fil-A restaurant to remove the existing drive-thru window and replace it with a full height sliding door. Minor structural, mechanical, and electrical modifications required for drive-thru area. No kitchen equipment or plumbing will be moved or modified. There will be no changes to the site or parking count. | |||
| Oct 21, 2026 | Remodel | 4900 CALVERT ST | 75247 | No value stated | QTEAM INHOUSE - Administrative request to create a new lease suite number (Suite B127) inside an existing warehouse. No construction, no structural changes, and no MEP (Mechanical, Electrical, Plumbing) work being performed. Establishing space for a Certificate of Occupancy. | |||
| Oct 21, 2026 | Commercial Accessory Structure Permit | 4739 MEMPHIS ST | 75207 | No value stated | 8ft tall fence installation | |||
| Oct 21, 2026 | Commercial Accessory Structure Permit | 5515 GLEN LAKES DR | 75231 | No value stated | MCR Install stone and mortar retaining walls. Max height 4'. Alexan Walnut Hill | |||
| Oct 21, 2026 | Commercial Accessory Structure Permit | 10805 WALNUT HILL LN | 75238 | No value stated | Gate Permit: I-635 SIDE ENTRANCE: (1st) 28' wide double swing gate, (Middle) double swing gate 20' opening, (3rd) slide single 28' fire lane. MAPLE RIDGE ENTRANCE: 24'wide opening double swing opening outside, WALNUT HILL ENTRANCE: Entry swings in 24' wide opening, Exit swings out 24'wide opening. Electrical line: 4 dedicated circuit 120v 20 amp | |||
| Oct 20, 2026 | Solar | 3011 MESA VIEW DR | 75241 | No value stated | MCR W/BATTERY Install 11.455kw PV system with 29 modules, 1 battery & MPU. | |||
| Oct 20, 2026 | Solar | 16332 LAUDER LN | 75248 | No value stated | Installing a Grid Tied, Roof Mounted, Solar PV System with a Battery Storage system and Full Home Backup, 3rd Party Plan Review. | |||
| Oct 20, 2026 | Solar | 4722 PURDUE AVE | 75209 | No value stated | Third Party Approved. Installing a 16.095 KW PV system, (1) TESLA INC. 1707000-XX-Y inverter/battery, and (1) TESLA INC. 1807000-XX-Y battery. Also installing (1) SPAN SERVICE PANEL. | |||
| Oct 20, 2026 | Solar | 3104 LINFIELD RD | 75216 | No value stated | MCR W/BATTERY Roof-mounted photovoltaic (PV) solar system with battery storage system for a residential installation. Plans have been reviewed and approved by a qualified third-party plan reviewer in accordance with Texas Local Government Code Chapter 247 (SB 1202), including stamped plans and Letter of Compliance. | |||
| Oct 20, 2026 | Roofing | 6335 VANDERBILT AVE | 75214 | No value stated | Roof Replacement of Laminate Material Type |
| ||
| Oct 20, 2026 | Roofing | 15305 LEAVALLEY DR | 75248 | No value stated | Re-roof |
| ||
| Oct 20, 2026 | Roofing | 8046 TEXRIDGE DR | 75232 | No value stated | Full roof replacement |
| ||
| Oct 20, 2026 | Roofing | 9934 ACKLIN DR | 75243 | No value stated | Tear off one roof & replace with a laminated shingle. |
| ||
| Oct 20, 2026 | Roofing | 6259 SARATOGA CIR | 75214 | No value stated | Full Roof replacement for house and detached garage |
| ||
| Oct 20, 2026 | Roofing | 6315 ROYAL LN | 75230 | No value stated | Remove roof down to decking, replace with synthetic felt, self-adhering valley liner, and architectural shingles |
| ||
| Oct 20, 2026 | Roofing | 3311 DESTINY WAY | 75237 | No value stated | Roof replacement |
| ||
| Oct 20, 2026 | Roofing | 6239 STICHTER AVE | 75230 | No value stated | remove and replace all underlayment and shingles |
| ||
| Oct 20, 2026 | Roofing | 3317 TOWNSEND DR | 75229 | No value stated | Residential re-roof |
| ||
| Oct 20, 2026 | Pool | 6947 CORONADO AVE | 75214 | No value stated | MCR Building a new gunite in-ground swimming pool + spa. |
| ||
| Oct 20, 2026 | Pool | 8703 WOOD HOMESTEAD DR | 75249 | No value stated | MCR New In-Ground 495 SF Concrete Pool and associated equipment and pad |
| ||
| Oct 20, 2026 | Pool | 7112 MERRIMAN PKWY | 75231 | No value stated | MCR Pool with spa, turf and pavers |
| ||
| Oct 20, 2026 | Pool | 6731 AVALON AVE | 75214 | No value stated | MCR In-Ground Residential Gunite Swimming Pool |
| ||
| Oct 20, 2026 | Plumbing | 18902 WHITEWATER LN | 75287 | No value stated | Gas test | |||
| Oct 20, 2026 | Plumbing | 8807 DAYTONIA AVE | 75218 | No value stated | Gas Test / Release | |||
| Oct 20, 2026 | Plumbing | 6 NONESUCH RD | 75214 | No value stated | lava kit sink toilet | |||
| Oct 20, 2026 | Plumbing | 4811 HALLMARK DR | 75229 | No value stated | New plumbing | |||
| Oct 20, 2026 | Plumbing | 10020 RIDGEHAVEN DR | 75238 | No value stated | Plumbing | |||
| Oct 20, 2026 | Plumbing | 3838 HIGH SUMMIT DR | 75244 | No value stated | replace 35ft of sewer | |||
| Oct 20, 2026 | Plumbing | 11414 CHERRY RIDGE CT | 75229 | No value stated | NEW PLUMBING SFD | |||
| Oct 20, 2026 | Plumbing | 7547 GREENBRIER DR | 75225 | No value stated | INSTALL NEW PLUMBING FOR NEW HOUSE. | |||
| Oct 20, 2026 | Plumbing | 1627 BONNIE VIEW RD | 75203 | No value stated | REPLACEMENT OF GAS WATER HEATER | |||
| Oct 20, 2026 | Plumbing | 6146 BRYAN PKWY | 75206 | No value stated | repipe sewer from main house to city easement in back yard | |||
| Oct 20, 2026 | Plumbing | 8555 SAN PEDRO PKWY | 75218 | No value stated | RUN GAS LINES TO POOL HEATER AND 2 FIRE BOWLS. |
| ||
| Oct 20, 2026 | Plumbing | 8823 STANWOOD DR | 75228 | No value stated | Gas line for pool heater |
| ||
| Oct 20, 2026 | Plumbing | 5005 DENTON DR | 75235 | No value stated | BRING NEW PLUNBING FOR NEW BUILDING | |||
| Oct 20, 2026 | Plumbing | 7444 LYNWORTH DR | 75248 | No value stated | 1. Make accesses in the kitchen, laundry, master bathroom, hall bathroom and front clean outs and tunnel 130’ to replace the existing cast iron with schedule 40 PVC pipe under the existing slab for the master bathroom and (2) hall bathrooms, AC hub drain, powder room, bar sink, laundry room and kitchen to the double clean outs in front of the house.2. Remove (4) water closets to replace flanges and reinstall.3. Replace the existing tub drain with a new PVC drain.4. Hand dig 30’ from the laundry room to the kitchen from the outside to connect to the kitchen drain to the new drain line.5. Anchor plumbing to structural beams as per code. | |||
| Oct 20, 2026 | Plumbing | 11631 SAHARA WAY | 75218 | No value stated | New Plumbing addition |