TxDOT Project CSJ#0196-03-293 (Electrical Service for Roadway Illumination)
Dallas building permits
Data through Oct 26, 2026Source: Dallas OpenData: Building Permits
Dallas in the last 30 days
- Permits issued
- 5,170
- Newest Permit
- Oct 26, 2026
- Plumbing1439
- Electrical1117
- HVAC683
- Remodel643
- New construction381
- 75229330
- 75214272
- 75230217
- 75206216
- 75248203
- ALEJANDRO COMPIAN R.M.P9
- ABLE CRAFT GENERAL CONTRACTOR LLC1
- SPRING VALLEY CONSTRUCTION CO.1
Permits
5,170 Permits in the last 30 days, page 35 of 104
Pro shows every Permit back to Jan 1, 2024. Full history
Requesting an electrical service release for Oncor meter installation at an existing residential property. No work.
Perform preventive maintenance of electrical distribution system for building. De-energize utility power. Test ground fault relays at switchgears. Perform test, torque, and clean of electrical panels, switchboards, panelboards, disconnects, and MCC.
need turn power on no electrical work
ZO BC Interior alteration of an approximately 960-square-foot existing commercial space for a retail tobacco and vape store (BUZZ BROS LLC). Proposed retail layout includes an open sales area with seven merchandise display cases, a cashier counter, slat-wall product displays, four storage rooms, one additional room, a rear storage area, and a restroom. Retail merchandise will include tobacco products, electronic cigarettes, smoking accessories, snacks, beverages, and general merchandise. The proposed floor plan shows a minimum 36-inch clearance between displays and along designated aisles. Work includes arranging and installing retail display fixtures and preparing the interior space for retail operations.
MCR Demo and build back as shown to alter the interior office space, not changing leasing space. Opening IT room into an open office area
QTEAM INHOUSE - THIS IS A REMODEL OF AN EXISTING TOM THUMB WHICH INCLUDES FLORAL, EMPLOYEE BREAKROOM, AND FIXTURE &EQUIPMENT UPDATES. NO CHANGE TO EXISTING STORE SQUARE FOOTAGE & EXITING.
ZO BC Replacement of existing cooling towers and steam boilers.
QTEAM INHOUSE - New construction of IMP walls for equipment rooms, expansion of existing spec office, and plumbing drains
MCR FOR SUITE 221 NEEDS ADDRESSING. COMMERCIAL INTERIOR REMODEL. VACANT NO TENANT YET.
MCR VACANT, NO TENANT YET, COMMERCIAL INTERIOR REMODEL
Existing commercial building. This permit application is being submitted at the direction of City of Dallas Building Code to reconcile discrepancies between the current floor plan and the last City-approved plans from 1966. All existing alterations were completed before the current occupant took possession of the property. No new construction is currently proposed. This application documents and seeks approval of existing conditions in connection with a pending Certificate of Occupancy application.
MCR FOR SUITE 201 NEEDS ADDRESSING. COMMERCIAL INTERIOR REMODEL, VACANT NO TENANT YET
ZO BC Interior renovation of existing medical procedure room.
MCR VACANT, NO TENANT YET, COMMERCIAL INTERIOR REMODEL
MCR FOR SUITE 199 , NEEDS ADDRESSING. COMMERCIAL INTERIOR REMODEL , VACANT, NO TENANT YET
QTEAM INHOUSE - FINISH OUT FOR A FENG CHA BOBA TEA FRANCHISE
QTEAM INHOUSE - CREATING TWO CASE OPENINGS TO COMBINE SUITE 115 TO 117
QTEAM INHOUSE - Alteration permit to officially combine former Suites 7071 Twin Hills Ave and 7071 Twin Hills Ave Suite A into 7071 Twin Hills Ave. No structural modifications.
Complete demo and remodel. Demo to the shell of the unit and build back. All new hvac, plumbing, mechanical, framing, drywall, millwork, cabinets, countertops, tile, fire detection, water detection, security, etc. Demo balcony to the structural slab, new waterproofing, new tile flooring, some new electrical outside, etc.
ZO BC-EXPEDITED Installation of pallet racking inside of an existing customer warehouse - no MEP work included nor proposed.
BU ZO Bishop Builders will construct interior enclosure improvements at GEM Lifecycle's Dallas processing facility per updated marked plan notes and onsite discussions. This buildout will create a secure, code-compliant processing enclosure that supports GEM's chain-of-custody protocols, material flow efficiency and the integrity of their certified data destruction and recycling operations.Scope Includes:6" metal stud wall framing — approx. 194 LF total (137 LF × 28' AFF full-height + 57 LF × 14' high mezzanine/return sections)5/8" Type-X drywall on both sides of all framed walls, taped, bedded, and finished through primer — approx. 9,268 SFSteel moment frame opening engineered for one (1) 14' × 14' industrial motorized roll-up doorStructural engineering allowance for moment frame design and coordinationOne (1) 14' × 14' industrial-grade motorized roll-up door with operator packageTwo (2) 36" hollow metal frame doors with commercial lever hardwareOne (1) 36" fire/man door with frame and hardware40 LF × 14' high vinyl/PVC soft wall curtain system — approx. 560 SFAll anchors, fasteners, slab attachments, debris removal and one-month scissor lift (2) rental General conditions, project management, field supervision and trade coordination
BU ZO Alcove Alteration At Building DDemo/remove existing units
BU ZO EL Expansion of an existing electrical substation that will improve the reliability and service for the current and future customers and meet growing demand in the area.
ZO BC Paint Booth
Installing an 8-foot-high wood fence at the back of the property.
MCR We will be building an engineered retaining wall in conjunction with a permit to expand the auto parking spaces at 3486 Cedardale.Associated Permits: Site Plan Review SITEPR-26-000201Excavation and Grading Permit EXCAV-GRADE-26-000092
MCR Residential Installation of Roof Mounted PV Solar Panels / 22 Modules / 9.020 KW DC, 7.678 KW AC
MCR W/BATTERY 11kw PV system with battery
MCR W/BATTERY Install 18.45kw PV system with 45 modules, 2 batteries & MPU.
MCR W/BATTERY Install energy storage system
MCR W/BATTERY Tyler Murph - Installation of a grid-tied, roof-mounted solar PV and battery system. (3RD PARTY REVIEWED)
MCR W/BATTERY Install roof mounted PV solar system and energy storage system
Tear off existing asphalt roof and dispose of all materials. Install new synthetic underlayment and ice and water shield in all valleys and around all penetrations. Install new IKO Cambridge class three impact resistant shingles. Reseal, all flashing and vents.
Follow-on work
- GuttersRule reroof-gutters v1
roof replacement no framing replacement
Follow-on work
- GuttersRule reroof-gutters v1
Replace Roof
Follow-on work
- GuttersRule reroof-gutters v1
Re Roof
Follow-on work
- GuttersRule reroof-gutters v1
Remove and Replace existing shingles
Follow-on work
- GuttersRule reroof-gutters v1
Remove and replace roofing shingles
Follow-on work
- GuttersRule reroof-gutters v1
Re-roof: no re-deck
Follow-on work
- GuttersRule reroof-gutters v1
Re Roof, apply TPO roofing system.
Follow-on work
- GuttersRule reroof-gutters v1
Removing and replace existing shingle roof
Follow-on work
- GuttersRule reroof-gutters v1
Remove existing roof and install a new roof.
Follow-on work
- GuttersRule reroof-gutters v1
Re roof shingles
Follow-on work
- GuttersRule reroof-gutters v1
MCR Construction of a new in-ground residential gunite swimming pool and attached raised spa in the rear yard of the existing residence.The proposed swimming pool will be approximately 31' x 15'1", with a surface area of 406 SF and depths ranging from 3'6" to 5'6". Construction includes excavation, steel reinforcement, gunite shell, tanning ledge with three bubblers, entry steps, underwater LED lighting, six decorative water features, tile, Leuders limestone coping, and StoneScapes interior finish.The project also includes a new 7' x 7' spa raised 18" above pool elevation, featuring nine hydrotherapy jets, two spillways into the pool, and associated plumbing.Additional work includes approximately 450 SF of pool decking, installation of pool circulation and filtration equipment, pumps, a natural gas heater, chlorination system, electrical connections, bonding, plumbing, drainage/overflow provisions, and pool automation controls.All work will be performed in accordance with the submitted construction plans and applicable City of Dallas building and safety requirements.
Follow-on work
- FenceRule pool-barrier v1
- LandscapingRule pool-site-work v1
MCR New Swimming Pool with Spa
Follow-on work
- FenceRule pool-barrier v1
- LandscapingRule pool-site-work v1
Portable Swim spa is going in a vault. Vault has already been permitted by house builder. Swim Spa is a portable unit with a locking cover. Swim spa will be placed inside the vault. No exterior plumbing is required. It is a self contained unit.
Follow-on work
- FenceRule pool-barrier v1
- New sewer line from half of the yard to the house 42ft.- Two way cleanouts 4x3- Up to 50 feet long of Tunnel for new drains- Up to 110 feet long trench for new sewer line.- Drains total ? 2 Toilets, 3 drains for 2nd floor, 4 sinks, 1 Laundry,1 shower, 1 Free standing tub and Kitchen.- Main Water line from half of the yard to the house with PRV Valve and access for irrigation system.
Gas Line Relay & Gas Test
New Build Duplex 4806/4808 Belmont Ave. - Plumbing associated with permit #RES-NEW-26-001460
| Issue date | Permit type | Address | ZIP | Declared value | Description | Contractor name as published | Follow-on work | Contact |
|---|---|---|---|---|---|---|---|---|
| Oct 16, 2026 | Electrical | 233 COMMERCE ST | 75207 | No value stated | TxDOT Project CSJ#0196-03-293 (Electrical Service for Roadway Illumination) | |||
| Oct 16, 2026 | Electrical | 321 E 8TH ST | 75203 | No value stated | Requesting an electrical service release for Oncor meter installation at an existing residential property. No work. | |||
| Oct 16, 2026 | Electrical | 5956 SHERRY LN | 75225 | No value stated | Perform preventive maintenance of electrical distribution system for building. De-energize utility power. Test ground fault relays at switchgears. Perform test, torque, and clean of electrical panels, switchboards, panelboards, disconnects, and MCC. | |||
| Oct 16, 2026 | Electrical | 8039 FERGUSON RD | 75228 | No value stated | need turn power on no electrical work | |||
| Oct 16, 2026 | Remodel | 101 S MUNGER BLVD | 75214 | No value stated | ZO BC Interior alteration of an approximately 960-square-foot existing commercial space for a retail tobacco and vape store (BUZZ BROS LLC). Proposed retail layout includes an open sales area with seven merchandise display cases, a cashier counter, slat-wall product displays, four storage rooms, one additional room, a rear storage area, and a restroom. Retail merchandise will include tobacco products, electronic cigarettes, smoking accessories, snacks, beverages, and general merchandise. The proposed floor plan shows a minimum 36-inch clearance between displays and along designated aisles. Work includes arranging and installing retail display fixtures and preparing the interior space for retail operations. | |||
| Oct 16, 2026 | Remodel | 10000 N CENTRAL EXPY | 75231 | No value stated | MCR Demo and build back as shown to alter the interior office space, not changing leasing space. Opening IT room into an open office area | |||
| Oct 16, 2026 | Remodel | 5809 E LOVERS LN | 75206 | No value stated | QTEAM INHOUSE - THIS IS A REMODEL OF AN EXISTING TOM THUMB WHICH INCLUDES FLORAL, EMPLOYEE BREAKROOM, AND FIXTURE &EQUIPMENT UPDATES. NO CHANGE TO EXISTING STORE SQUARE FOOTAGE & EXITING. | |||
| Oct 16, 2026 | Remodel | 2222 WELBORN ST | 75219 | No value stated | ZO BC Replacement of existing cooling towers and steam boilers. | |||
| Oct 16, 2026 | Remodel | 9078 VAN HORN DR | 75241 | No value stated | QTEAM INHOUSE - New construction of IMP walls for equipment rooms, expansion of existing spec office, and plumbing drains | |||
| Oct 16, 2026 | Remodel | 2900 WALNUT HILL LN | 75229 | No value stated | MCR FOR SUITE 221 NEEDS ADDRESSING. COMMERCIAL INTERIOR REMODEL. VACANT NO TENANT YET. | |||
| Oct 16, 2026 | Remodel | 2900 WALNUT HILL LN | 75229 | No value stated | MCR VACANT, NO TENANT YET, COMMERCIAL INTERIOR REMODEL | |||
| Oct 16, 2026 | Remodel | 1500 PLANTATION RD | 75235 | No value stated | Existing commercial building. This permit application is being submitted at the direction of City of Dallas Building Code to reconcile discrepancies between the current floor plan and the last City-approved plans from 1966. All existing alterations were completed before the current occupant took possession of the property. No new construction is currently proposed. This application documents and seeks approval of existing conditions in connection with a pending Certificate of Occupancy application. | |||
| Oct 16, 2026 | Remodel | 2900 WALNUT HILL LN | 75229 | No value stated | MCR FOR SUITE 201 NEEDS ADDRESSING. COMMERCIAL INTERIOR REMODEL, VACANT NO TENANT YET | |||
| Oct 16, 2026 | Remodel | 8200 WALNUT HILL LN | 75231 | No value stated | ZO BC Interior renovation of existing medical procedure room. | |||
| Oct 16, 2026 | Remodel | 2900 WALNUT HILL LN | 75229 | No value stated | MCR VACANT, NO TENANT YET, COMMERCIAL INTERIOR REMODEL | |||
| Oct 16, 2026 | Remodel | 2900 WALNUT HILL LN | 75229 | No value stated | MCR FOR SUITE 199 , NEEDS ADDRESSING. COMMERCIAL INTERIOR REMODEL , VACANT, NO TENANT YET | |||
| Oct 16, 2026 | Remodel | 9655 WEBB CHAPEL RD | 75220 | No value stated | QTEAM INHOUSE - FINISH OUT FOR A FENG CHA BOBA TEA FRANCHISE | |||
| Oct 16, 2026 | Remodel | 3011 GULDEN LN | 75212 | No value stated | QTEAM INHOUSE - CREATING TWO CASE OPENINGS TO COMBINE SUITE 115 TO 117 | |||
| Oct 16, 2026 | Remodel | 7071 TWIN HILLS AVE | 75231 | No value stated | QTEAM INHOUSE - Alteration permit to officially combine former Suites 7071 Twin Hills Ave and 7071 Twin Hills Ave Suite A into 7071 Twin Hills Ave. No structural modifications. | |||
| Oct 16, 2026 | Remodel | 2801 TURTLE CREEK BLVD | 75219 | No value stated | Complete demo and remodel. Demo to the shell of the unit and build back. All new hvac, plumbing, mechanical, framing, drywall, millwork, cabinets, countertops, tile, fire detection, water detection, security, etc. Demo balcony to the structural slab, new waterproofing, new tile flooring, some new electrical outside, etc. | |||
| Oct 16, 2026 | Remodel | 9890 BONNIE VIEW RD | 75241 | No value stated | ZO BC-EXPEDITED Installation of pallet racking inside of an existing customer warehouse - no MEP work included nor proposed. | |||
| Oct 16, 2026 | Remodel | 3950 PLATINUM WAY | 75237 | No value stated | BU ZO Bishop Builders will construct interior enclosure improvements at GEM Lifecycle's Dallas processing facility per updated marked plan notes and onsite discussions. This buildout will create a secure, code-compliant processing enclosure that supports GEM's chain-of-custody protocols, material flow efficiency and the integrity of their certified data destruction and recycling operations.Scope Includes:6" metal stud wall framing — approx. 194 LF total (137 LF × 28' AFF full-height + 57 LF × 14' high mezzanine/return sections)5/8" Type-X drywall on both sides of all framed walls, taped, bedded, and finished through primer — approx. 9,268 SFSteel moment frame opening engineered for one (1) 14' × 14' industrial motorized roll-up doorStructural engineering allowance for moment frame design and coordinationOne (1) 14' × 14' industrial-grade motorized roll-up door with operator packageTwo (2) 36" hollow metal frame doors with commercial lever hardwareOne (1) 36" fire/man door with frame and hardware40 LF × 14' high vinyl/PVC soft wall curtain system — approx. 560 SFAll anchors, fasteners, slab attachments, debris removal and one-month scissor lift (2) rental General conditions, project management, field supervision and trade coordination | |||
| Oct 16, 2026 | Remodel | 13575 GOLDMARK DR | 75240 | No value stated | BU ZO Alcove Alteration At Building DDemo/remove existing units | |||
| Oct 16, 2026 | Remodel | 1108 N ST AUGUSTINE DR | 75217 | No value stated | BU ZO EL Expansion of an existing electrical substation that will improve the reliability and service for the current and future customers and meet growing demand in the area. | |||
| Oct 16, 2026 | Remodel | 2403 COMMUNITY DR | 75220 | No value stated | ZO BC Paint Booth | |||
| Oct 16, 2026 | Commercial Accessory Structure Permit | 701 N LANCASTER AVE | 75203 | No value stated | Installing an 8-foot-high wood fence at the back of the property. | |||
| Oct 16, 2026 | Commercial Accessory Structure Permit | 3486 CEDARDALE RD | 75241 | No value stated | MCR We will be building an engineered retaining wall in conjunction with a permit to expand the auto parking spaces at 3486 Cedardale.Associated Permits: Site Plan Review SITEPR-26-000201Excavation and Grading Permit EXCAV-GRADE-26-000092 | |||
| Oct 15, 2026 | Solar | 4108 BROOKTREE LN | 75287 | No value stated | MCR Residential Installation of Roof Mounted PV Solar Panels / 22 Modules / 9.020 KW DC, 7.678 KW AC | |||
| Oct 15, 2026 | Solar | 8839 WINTERSET AVE | 75232 | No value stated | MCR W/BATTERY 11kw PV system with battery | |||
| Oct 15, 2026 | Solar | 9125 FOREST HILLS BLVD | 75218 | No value stated | MCR W/BATTERY Install 18.45kw PV system with 45 modules, 2 batteries & MPU. | |||
| Oct 15, 2026 | Solar | 7663 INDIAN SPRINGS RD | 75248 | No value stated | MCR W/BATTERY Install energy storage system | |||
| Oct 15, 2026 | Solar | 427 BLANNING DR | 75218 | No value stated | MCR W/BATTERY Tyler Murph - Installation of a grid-tied, roof-mounted solar PV and battery system. (3RD PARTY REVIEWED) | |||
| Oct 15, 2026 | Solar | 6914 DELOACHE AVE | 75225 | No value stated | MCR W/BATTERY Install roof mounted PV solar system and energy storage system | |||
| Oct 15, 2026 | Roofing | 2933 COTEAU WAY | 75227 | No value stated | Tear off existing asphalt roof and dispose of all materials. Install new synthetic underlayment and ice and water shield in all valleys and around all penetrations. Install new IKO Cambridge class three impact resistant shingles. Reseal, all flashing and vents. |
| ||
| Oct 15, 2026 | Roofing | 14109 BROOKRIDGE DR | 75254 | No value stated | roof replacement no framing replacement |
| ||
| Oct 15, 2026 | Roofing | 8352 PLAINVIEW DR | 75217 | No value stated | Replace Roof |
| ||
| Oct 15, 2026 | Roofing | 6946 CLEARGLEN DR | 75232 | No value stated | Re Roof |
| ||
| Oct 15, 2026 | Roofing | 10816 EDEN ROC DR | 75238 | No value stated | Remove and Replace existing shingles |
| ||
| Oct 15, 2026 | Roofing | 6014 LA COSA DR | 75248 | No value stated | Remove and replace roofing shingles |
| ||
| Oct 15, 2026 | Roofing | 9409 KERRVILLE ST | 75227 | No value stated | Re-roof: no re-deck |
| ||
| Oct 15, 2026 | Roofing | 4813 SYCAMORE ST | 75204 | No value stated | Re Roof, apply TPO roofing system. |
| ||
| Oct 15, 2026 | Roofing | 6543 CHEVY CHASE AVE | 75225 | No value stated | Removing and replace existing shingle roof |
| ||
| Oct 15, 2026 | Roofing | 7106 STONETRAIL DR | 75230 | No value stated | Remove existing roof and install a new roof. |
| ||
| Oct 15, 2026 | Roofing | 1703 TRADE WINDS DR | 75241 | No value stated | Re roof shingles |
| ||
| Oct 15, 2026 | Pool | 6441 TULIP LN | 75230 | No value stated | MCR Construction of a new in-ground residential gunite swimming pool and attached raised spa in the rear yard of the existing residence.The proposed swimming pool will be approximately 31' x 15'1", with a surface area of 406 SF and depths ranging from 3'6" to 5'6". Construction includes excavation, steel reinforcement, gunite shell, tanning ledge with three bubblers, entry steps, underwater LED lighting, six decorative water features, tile, Leuders limestone coping, and StoneScapes interior finish.The project also includes a new 7' x 7' spa raised 18" above pool elevation, featuring nine hydrotherapy jets, two spillways into the pool, and associated plumbing.Additional work includes approximately 450 SF of pool decking, installation of pool circulation and filtration equipment, pumps, a natural gas heater, chlorination system, electrical connections, bonding, plumbing, drainage/overflow provisions, and pool automation controls.All work will be performed in accordance with the submitted construction plans and applicable City of Dallas building and safety requirements. |
| ||
| Oct 15, 2026 | Pool | 6153 GLENNOX LN | 75214 | No value stated | MCR New Swimming Pool with Spa |
| ||
| Oct 15, 2026 | Pool | 1532 OAK KNOLL ST | 75208 | No value stated | Portable Swim spa is going in a vault. Vault has already been permitted by house builder. Swim Spa is a portable unit with a locking cover. Swim spa will be placed inside the vault. No exterior plumbing is required. It is a self contained unit. |
| ||
| Oct 15, 2026 | Plumbing | 7937 DEER TRAIL DR | 75238 | No value stated | - New sewer line from half of the yard to the house 42ft.- Two way cleanouts 4x3- Up to 50 feet long of Tunnel for new drains- Up to 110 feet long trench for new sewer line.- Drains total ? 2 Toilets, 3 drains for 2nd floor, 4 sinks, 1 Laundry,1 shower, 1 Free standing tub and Kitchen.- Main Water line from half of the yard to the house with PRV Valve and access for irrigation system. | |||
| Oct 15, 2026 | Plumbing | 237 PENLAND ST | 75224 | No value stated | Gas Line Relay & Gas Test | |||
| Oct 15, 2026 | Plumbing | 4806 BELMONT AVE | 75204 | No value stated | New Build Duplex 4806/4808 Belmont Ave. - Plumbing associated with permit #RES-NEW-26-001460 |