Replace backflow device on the irrigation line
Dallas building permits
Data through Oct 26, 2026Source: Dallas OpenData: Building Permits
Dallas in the last 30 days
- Permits issued
- 5,170
- Newest Permit
- Oct 26, 2026
- Plumbing1439
- Electrical1117
- HVAC683
- Remodel643
- New construction381
- 75229330
- 75214272
- 75230217
- 75206216
- 75248203
- ALEJANDRO COMPIAN R.M.P9
- ABLE CRAFT GENERAL CONTRACTOR LLC1
- SPRING VALLEY CONSTRUCTION CO.1
Permits
5,170 Permits in the last 30 days, page 50 of 104
Pro shows every Permit back to Jan 1, 2024. Full history
LVL 19
There was and old approve building permit that was approved Long ago he would like to get it re submitted with updated plans
QTEAM MEETING TBD - New one-story 2,893 SF café/restaurant with greenhouse, patios, and kitchen (A-2, V-B, sprinklered). Includes demo of existing structures, site paving, 41 parking spaces, utilities, drainage, and landscaping.
QTEAM MEETING 11.03.26 (ALL DAY)- New construction of a multi-family development with resident only amenities. MU-3 base zoning
HVAC Remodel
NICU Satellite Compounding Room and Expansion that includes the demo and addition of HVAC Ductwork and addition of fan coil units and fans. Will be supplying chilled water and heating water piping to this equipment.
finish out ac ducts
Replacing (2) HVAC Chillers
26.0231 Velocis Reworking existing HVAC system
HVAC REMOD
HVAC Changeout, replacing 7 ac units with direct replacement equipment.
The Briscoe Apartments Bldg. 1/Mail Room- Foundation Repair- Installing 44 Ext. & 13 Int. Pilings
12- lights20 recess lights16 outlets12 ceiling lightsconnect water heater
Remodel - Electrical Interior installations.
remodel
remodel
ELECTRICL INSTALLATION, AND LIGHT INSTALLATION
electrical installation and light installation
Electrical No Work - Clean and Show
Electrical no work - Clean and show
Electrical No Work Clean and Show
Clean and show no electrical no work
Clean and show
Electric - Basement
Electric - Kitchen
Electric - 1st Floor "B"
Electric - Storm Shelter
Lobby Addition
Electric - 3rd Floor "B"
Electric - 2nd Floor "B"
Electric - Area A 3rd Floor
Electrical - 1st Floor Area A
addition- classrooms
Pipe and wire fuel system. Main power is brought to us by the site electrician.
Repair/replace damaged meter base and reconnect utility wires from tap can. Oncor services are currently disconnected.
Repair/Replace electrical power from service to lighting poles in parking lot that was damaged during excavation for new concrete work on previous permit.
Remove and replace existing damaged City sidewalk with new concrete sidewalk to City of Dallas standards. Work includes demolition, subgrade preparation, concrete placement, finishing, curing, and cleanup.
Install Construction Fence Around Property For Duration Of Demo. Provide Consulting, Specs & Final Report. Demolish Burned Building & Dispose Of Debris Per NESHAP Regulations. Remove Foundation System Down To Dirt; Remove Piers 2' Below Existing Grade. Backfill Crawl Space With Common Fill Dirt Up To Existing Dirt Grade & Rough Grade. Install Silt Fence Around Disturbed Area. Existing Detached Storage Building & Pavement To Remain. Load, Transport & Legally Dispose Of Resultant Debris
ZO BC Change City Plans - Change Use (Office to Retail)
ZO BC including concrete footings to support metal posts, metal framing, metal siding, metal roof, electrical work, subpanel, wiring, outlets. new
Data Center Remodel including Main Distribution Feeders, MBP to UPS Feeders, UPS Control Conduits, UPS Battery Cabinet Feeders, PDU Feeder Install, Transformer Feeder Install, CRAC Branch Circuits, CRAC Condenser Branch Circuit, Future CRAC Units, Conduit Repair and Supports
| Issue date | Permit type | Address | ZIP | Declared value | Description | Contractor name as published | Follow-on work | Contact |
|---|---|---|---|---|---|---|---|---|
| Oct 13, 2026 | Plumbing | 3550 FOREST LN | 75234 | No value stated | Replace backflow device on the irrigation line | |||
| Oct 13, 2026 | New construction | 1919 WOODALL RODGERS FWY | 75201 | No value stated | ||||
| Oct 13, 2026 | New construction | 1919 WOODALL RODGERS FWY | 75201 | No value stated | ||||
| Oct 13, 2026 | New construction | 1919 WOODALL RODGERS FWY | 75201 | No value stated | ||||
| Oct 13, 2026 | New construction | 1919 WOODALL RODGERS FWY | 75201 | No value stated | ||||
| Oct 13, 2026 | New construction | 1919 WOODALL RODGERS FWY | 75201 | No value stated | ||||
| Oct 13, 2026 | New construction | 1919 WOODALL RODGERS FWY | 75201 | No value stated | ||||
| Oct 13, 2026 | New construction | 1919 WOODALL RODGERS FWY | 75201 | No value stated | ||||
| Oct 13, 2026 | New construction | 1919 WOODALL RODGERS FWY | 75201 | No value stated | ||||
| Oct 13, 2026 | New construction | 1919 WOODALL RODGERS FWY | 75201 | No value stated | LVL 19 | |||
| Oct 13, 2026 | New construction | 3822 W LEDBETTER DR | 75233 | No value stated | There was and old approve building permit that was approved Long ago he would like to get it re submitted with updated plans | |||
| Oct 13, 2026 | New construction | 663 W DAVIS ST | 75208 | No value stated | QTEAM MEETING TBD - New one-story 2,893 SF café/restaurant with greenhouse, patios, and kitchen (A-2, V-B, sprinklered). Includes demo of existing structures, site paving, 41 parking spaces, utilities, drainage, and landscaping. | |||
| Oct 13, 2026 | New construction | 12400 N CENTRAL EXPY | 75243 | No value stated | QTEAM MEETING 11.03.26 (ALL DAY)- New construction of a multi-family development with resident only amenities. MU-3 base zoning | |||
| Oct 13, 2026 | HVAC | 5600 SMU BLVD | 75206 | No value stated | HVAC Remodel | |||
| Oct 13, 2026 | HVAC | 8200 WALNUT HILL LN | 75231 | No value stated | NICU Satellite Compounding Room and Expansion that includes the demo and addition of HVAC Ductwork and addition of fan coil units and fans. Will be supplying chilled water and heating water piping to this equipment. | |||
| Oct 13, 2026 | HVAC | 2534 ROYAL LN | 75229 | No value stated | finish out ac ducts | |||
| Oct 13, 2026 | HVAC | 2940 SINGLETON BLVD | 75212 | No value stated | Replacing (2) HVAC Chillers | |||
| Oct 13, 2026 | HVAC | 3811 TURTLE CREEK BLVD | 75219 | No value stated | 26.0231 Velocis Reworking existing HVAC system | |||
| Oct 13, 2026 | HVAC | 5600 SMU BLVD | 75206 | No value stated | HVAC REMOD | |||
| Oct 13, 2026 | HVAC | 3322 N BUCKNER BLVD | 75228 | No value stated | HVAC Changeout, replacing 7 ac units with direct replacement equipment. | |||
| Oct 13, 2026 | Commercial Foundation Repair | 12639 COIT RD | 75251 | No value stated | The Briscoe Apartments Bldg. 1/Mail Room- Foundation Repair- Installing 44 Ext. & 13 Int. Pilings | |||
| Oct 13, 2026 | Electrical | 2534 ROYAL LN | 75229 | No value stated | 12- lights20 recess lights16 outlets12 ceiling lightsconnect water heater | |||
| Oct 13, 2026 | Electrical | 2021 MCKINNEY AVE | 75201 | No value stated | Remodel - Electrical Interior installations. | |||
| Oct 13, 2026 | Electrical | 208 S HASKELL AVE | 75226 | No value stated | remodel | |||
| Oct 13, 2026 | Electrical | 2911 TURTLE CREEK BLVD | 75219 | No value stated | remodel | |||
| Oct 13, 2026 | Electrical | 1722 ROUTH ST | 75201 | No value stated | ELECTRICL INSTALLATION, AND LIGHT INSTALLATION | |||
| Oct 13, 2026 | Electrical | 1722 ROUTH ST | 75201 | No value stated | electrical installation and light installation | |||
| Oct 13, 2026 | Electrical | 7949 WALNUT HILL LN | 75230 | No value stated | Electrical No Work - Clean and Show | |||
| Oct 13, 2026 | Electrical | 7949 WALNUT HILL LN | 75230 | No value stated | Electrical no work - Clean and show | |||
| Oct 13, 2026 | Electrical | 7859 WALNUT HILL LN | 75230 | No value stated | Electrical No Work Clean and Show | |||
| Oct 13, 2026 | Electrical | 7825 FIREFALL WAY | 75230 | No value stated | Clean and show no electrical no work | |||
| Oct 13, 2026 | Electrical | 10912 SANDEN DR | 75238 | No value stated | Clean and show | |||
| Oct 13, 2026 | Electrical | 7630 ARAPAHO RD | 75248 | No value stated | Electric - Basement | |||
| Oct 13, 2026 | Electrical | 7630 ARAPAHO RD | 75248 | No value stated | Electric - Kitchen | |||
| Oct 13, 2026 | Electrical | 7630 ARAPAHO RD | 75248 | No value stated | Electric - 1st Floor "B" | |||
| Oct 13, 2026 | Electrical | 7630 ARAPAHO RD | 75248 | No value stated | Electric - Storm Shelter | |||
| Oct 13, 2026 | Electrical | 3959 NORTHAVEN RD | 75229 | No value stated | Lobby Addition | |||
| Oct 13, 2026 | Electrical | 7630 ARAPAHO RD | 75248 | No value stated | Electric - 3rd Floor "B" | |||
| Oct 13, 2026 | Electrical | 7630 ARAPAHO RD | 75248 | No value stated | Electric - 2nd Floor "B" | |||
| Oct 13, 2026 | Electrical | 7630 ARAPAHO RD | 75248 | No value stated | Electric - Area A 3rd Floor | |||
| Oct 13, 2026 | Electrical | 7630 ARAPAHO RD | 75248 | No value stated | Electrical - 1st Floor Area A | |||
| Oct 13, 2026 | Electrical | 3959 NORTHAVEN RD | 75229 | No value stated | addition- classrooms | |||
| Oct 13, 2026 | Electrical | 4530 GREENVILLE AVE | 75206 | No value stated | Pipe and wire fuel system. Main power is brought to us by the site electrician. | |||
| Oct 13, 2026 | Electrical | 11227 GOODNIGHT LN | 75229 | No value stated | Repair/replace damaged meter base and reconnect utility wires from tap can. Oncor services are currently disconnected. | |||
| Oct 13, 2026 | Electrical | 5219 LEMMON AVE | 75235 | No value stated | Repair/Replace electrical power from service to lighting poles in parking lot that was damaged during excavation for new concrete work on previous permit. | |||
| Oct 13, 2026 | Commercial Drive Approach and Sidewalk Permit | 2514 LUCAS DR | 75219 | No value stated | Remove and replace existing damaged City sidewalk with new concrete sidewalk to City of Dallas standards. Work includes demolition, subgrade preparation, concrete placement, finishing, curing, and cleanup. | |||
| Oct 13, 2026 | Demolition | 2615 ROUTH ST | 75201 | No value stated | Install Construction Fence Around Property For Duration Of Demo. Provide Consulting, Specs & Final Report. Demolish Burned Building & Dispose Of Debris Per NESHAP Regulations. Remove Foundation System Down To Dirt; Remove Piers 2' Below Existing Grade. Backfill Crawl Space With Common Fill Dirt Up To Existing Dirt Grade & Rough Grade. Install Silt Fence Around Disturbed Area. Existing Detached Storage Building & Pavement To Remain. Load, Transport & Legally Dispose Of Resultant Debris | |||
| Oct 13, 2026 | Remodel | 7303 FERGUSON RD | 75228 | No value stated | ZO BC Change City Plans - Change Use (Office to Retail) | |||
| Oct 13, 2026 | Remodel | 8558 DENTON DR | 75235 | No value stated | ZO BC including concrete footings to support metal posts, metal framing, metal siding, metal roof, electrical work, subpanel, wiring, outlets. new | |||
| Oct 13, 2026 | Remodel | 4939 READING ST | 75247 | No value stated | Data Center Remodel including Main Distribution Feeders, MBP to UPS Feeders, UPS Control Conduits, UPS Battery Cabinet Feeders, PDU Feeder Install, Transformer Feeder Install, CRAC Branch Circuits, CRAC Condenser Branch Circuit, Future CRAC Units, Conduit Repair and Supports |