to replace x1 50 gal gas water heater in the hallway closet by front door and x1 40 gal gas water heater in the garage platform
Dallas building permits
Data through Oct 26, 2026Source: Dallas OpenData: Building Permits
Dallas in the last 30 days
- Permits issued
- 5,177
- Newest Permit
- Oct 26, 2026
- Plumbing1441
- Electrical1103
- HVAC696
- Remodel648
- New construction376
- 75229335
- 75214273
- 75230221
- 75248207
- 75217203
- ALEJANDRO COMPIAN R.M.P9
- ABLE CRAFT GENERAL CONTRACTOR LLC1
- HCBeck, LTD1
- SPRING VALLEY CONSTRUCTION CO.1
Permits
5,177 Permits in the last 30 days, page 62 of 104
Pro shows every Permit back to Jan 1, 2024. Full history
install new plumbing
Hot water reroute and sewer tunnel
Gas Test
Replace gas water heater and gas stove
Gas line relay around new pool construction and gas line to pool heater
Follow-on work
- FenceRule pool-barrier v1
Gas line to pool heater and fire pit
Follow-on work
- FenceRule pool-barrier v1
TAKING OUT OLD FIXTURES & INSTALLING NEW
Install new construction plumbing
under slab sewer repair
gas repair
Atmos turned off gas due to gas leak. Scope of WorkUpon inspection, the existing 1 1/4" gas riser is leaking at the connection point to the existing gas poly piping underground. The excavation crew has already exposed the piping in the affected area to allow for the necessary repair.Our proposed work will include:* Remove and replace the existing 1 1/4" gas riser with a new 1 1/4" gas poly-compatible riser assembly.* Make the necessary connection to the existing underground gas poly piping.* Perform a pressure test on the gas line from the riser toward the house after the repair is completed.* Verify that the repaired connection and accessible gas line are holding pressure and that no additional leaks are present.* Once the repair passes testing, coordinate the necessary City of Dallas inspection.Work to be completed in the morning 10/9/26
capped off fireplace line in attic and repaired leak by city meter
under slab sewer repair
50 GAL GAS WH ATTIC
Mainline sewer replacement
Install 40 Gallon Gas Water Heater (Swap Out)
Install 50 Gallon Electric Water Heater in Garage (Swap Out)
REPLACE ELECTRIC WATER HEATER
Replacing approx. 70' portion of sewer drain lines under slab of house. Rerouting approx. 120' of sewer drain line from under slab to outside and rerouting back to main in yard. Test and inspection
Gas repair
double check and water line replacement
GAS TEST
gas work for generator
SINGLE LINE WATER REROUTE
gas for generator
Install whole new gas system from meter and all new gas in house to serve 4 appliances.
gas repair with test
water heater replacement 50 gal
GAS TEST TO RENEW SERVICE. PROPERTY HAS BEEN VACANT AND NEW SERVICE IS REQUIRED
FIX GAS LEAK
Install new construction plumbing
Replace existing 40-gallon gas water heater
run gas line to generator
RESIDENTIAL PLUMBING AND GAS INSTALL
RESIDENTIAL PLUMBING AND GAS INSTALL
water heater 50 gal
New plumbing for a two-story addition to an existing single family including a new attached garage6- Lavatories 4- Toilets 1- Kitchen sink 1- Laundry 1- Regular tub 2- Shower pan liner 1- Freestanding tub 1- Tankless water heater 2- Hose bibs Gas, Sewer and Water services
REPLACE 50 GAL GAS WH
INSTALLING ALL PLUMBING FOR NEW CONSTRUCTION
NSFAA-NEW HOUSE, VALUE $130,000. ONE STORY, LIVING AREA 2,425. SQ FT; GARAGE 431. SQ FT; COVERED PATIO 411. SQ FT; PORCH 63. SQ FT; TOTAL CONSTRUCTION 3,330. SQ FT
NSFAA WE WILL DEMO A SINGLE FAMILY HOME AND REPLACE IT WITH A NEW CONSTRUCTION DUPLEX.
Follow-on work
- FenceRule new-single-family v1
- GuttersRule new-single-family v1
- LandscapingRule new-single-family v1
NSFAA New Home Build
NSFAA NEW RESIDENTIAL CONSTRUCTION
RSVP-This is a residential new construction project consisting of a 1,356-square-foot house, a 44-square-foot front porch, and a 25-square-foot rear porch. The site improvements include a 280-square-foot concrete parking pad, and 221.6 square feet of concrete walkways.As part of the new construction, the project also includes the demolition of the existing damaged City sidewalk and its replacement with 877.46 square feet of new concrete sidewalk.
NSFAA
NSFAA-Proposed construction of a 6,441 SF, two-story single-family residence with conventional wood-frame construction. The exterior will feature predominantly stucco on the front elevation and board-and-batten siding on the side and rear elevations. The roof will be finished with asphalt shingles.
Follow-on work
- FenceRule new-single-family v1
- GuttersRule new-single-family v1
- LandscapingRule new-single-family v1
NSFAA New Construction SFH \| 3742 Dunhaven Rd
NSFAA-new construction home 4500 sq ft with detach garage
NSFAA Proposed new single family construction.
Follow-on work
- FenceRule new-single-family v1
- GuttersRule new-single-family v1
- LandscapingRule new-single-family v1
| Issue date | Permit type | Address | ZIP | Declared value | Description | Contractor name as published | Follow-on work | Contact |
|---|---|---|---|---|---|---|---|---|
| Oct 9, 2026 | Plumbing | 8844 KENTON DR | 75231 | No value stated | to replace x1 50 gal gas water heater in the hallway closet by front door and x1 40 gal gas water heater in the garage platform | |||
| Oct 9, 2026 | Plumbing | 9512 ROCKBROOK DR | 75220 | No value stated | install new plumbing | |||
| Oct 9, 2026 | Plumbing | 5407 WILLOW WOOD LN | 75252 | No value stated | Hot water reroute and sewer tunnel | |||
| Oct 9, 2026 | Plumbing | 8811 STULTS RD | 75243 | No value stated | Gas Test | |||
| Oct 9, 2026 | Plumbing | 9404 BERMUDA RD | 75241 | No value stated | Replace gas water heater and gas stove | |||
| Oct 9, 2026 | Plumbing | 9407 SPRING BRANCH DR | 75238 | No value stated | Gas line relay around new pool construction and gas line to pool heater |
| ||
| Oct 9, 2026 | Plumbing | 6255 PARK LN | 75225 | No value stated | Gas line to pool heater and fire pit |
| ||
| Oct 9, 2026 | Plumbing | 3701 TURTLE CREEK BLVD | 75219 | No value stated | TAKING OUT OLD FIXTURES & INSTALLING NEW | |||
| Oct 9, 2026 | Plumbing | 1905 LEATH ST | 75212 | No value stated | Install new construction plumbing | |||
| Oct 9, 2026 | Plumbing | 7317 NORTHAVEN RD | 75230 | No value stated | under slab sewer repair | |||
| Oct 9, 2026 | Plumbing | 7721 IDLEWOOD LN | 75230 | No value stated | gas repair | |||
| Oct 9, 2026 | Plumbing | 16923 PRESTON BEND DR | 75248 | No value stated | Atmos turned off gas due to gas leak. Scope of WorkUpon inspection, the existing 1 1/4" gas riser is leaking at the connection point to the existing gas poly piping underground. The excavation crew has already exposed the piping in the affected area to allow for the necessary repair.Our proposed work will include:* Remove and replace the existing 1 1/4" gas riser with a new 1 1/4" gas poly-compatible riser assembly.* Make the necessary connection to the existing underground gas poly piping.* Perform a pressure test on the gas line from the riser toward the house after the repair is completed.* Verify that the repaired connection and accessible gas line are holding pressure and that no additional leaks are present.* Once the repair passes testing, coordinate the necessary City of Dallas inspection.Work to be completed in the morning 10/9/26 | |||
| Oct 9, 2026 | Plumbing | 7611 DENTCREST DR | 75254 | No value stated | capped off fireplace line in attic and repaired leak by city meter | |||
| Oct 9, 2026 | Plumbing | 2725 MAVERICK AVE | 75228 | No value stated | under slab sewer repair | |||
| Oct 9, 2026 | Plumbing | 5111 SUMMIT HILL DR | 75287 | No value stated | 50 GAL GAS WH ATTIC | |||
| Oct 9, 2026 | Plumbing | 2937 MESA VIEW DR | 75241 | No value stated | Mainline sewer replacement | |||
| Oct 9, 2026 | Plumbing | 12323 ROSSER RD | 75244 | No value stated | Install 40 Gallon Gas Water Heater (Swap Out) | |||
| Oct 9, 2026 | Plumbing | 145 CLIFF HEIGHTS CIR | 75241 | No value stated | Install 50 Gallon Electric Water Heater in Garage (Swap Out) | |||
| Oct 9, 2026 | Plumbing | 4219 PRESCOTT AVE | 75219 | No value stated | REPLACE ELECTRIC WATER HEATER | |||
| Oct 9, 2026 | Plumbing | 3838 DUCHESS TRL | 75229 | No value stated | Replacing approx. 70' portion of sewer drain lines under slab of house. Rerouting approx. 120' of sewer drain line from under slab to outside and rerouting back to main in yard. Test and inspection | |||
| Oct 9, 2026 | Plumbing | 11620 ROGUE WAY | 75218 | No value stated | Gas repair | |||
| Oct 9, 2026 | Plumbing | 10107 CROMWELL DR | 75229 | No value stated | double check and water line replacement | |||
| Oct 9, 2026 | Plumbing | 2515 LANERI AVE | 75206 | No value stated | GAS TEST | |||
| Oct 9, 2026 | Plumbing | 3851 REGENT DR | 75229 | No value stated | gas work for generator | |||
| Oct 9, 2026 | Plumbing | 4210 GILBERT AVE | 75219 | No value stated | SINGLE LINE WATER REROUTE | |||
| Oct 9, 2026 | Plumbing | 6206 STEFANI DR | 75225 | No value stated | gas for generator | |||
| Oct 9, 2026 | Plumbing | 6223 REIGER AVE | 75214 | No value stated | Install whole new gas system from meter and all new gas in house to serve 4 appliances. | |||
| Oct 9, 2026 | Plumbing | 10422 SANDRA LYNN DR | 75228 | No value stated | gas repair with test | |||
| Oct 9, 2026 | Plumbing | 3465 HOWELL ST | 75204 | No value stated | water heater replacement 50 gal | |||
| Oct 9, 2026 | Plumbing | 716 BLAYLOCK DR | 75203 | No value stated | GAS TEST TO RENEW SERVICE. PROPERTY HAS BEEN VACANT AND NEW SERVICE IS REQUIRED | |||
| Oct 9, 2026 | Plumbing | 4000 STONEBRIDGE DR | 75204 | No value stated | FIX GAS LEAK | |||
| Oct 9, 2026 | Plumbing | 6223 ELLSWORTH AVE | 75214 | No value stated | Install new construction plumbing | |||
| Oct 9, 2026 | Plumbing | 3629 AINSWORTH DR | 75229 | No value stated | Replace existing 40-gallon gas water heater | |||
| Oct 9, 2026 | Plumbing | 8524 SAN FERNANDO WAY | 75218 | No value stated | run gas line to generator | |||
| Oct 9, 2026 | Plumbing | 4136 SADDLEBACK DR | 75227 | No value stated | RESIDENTIAL PLUMBING AND GAS INSTALL | |||
| Oct 9, 2026 | Plumbing | 4128 SADDLEBACK DR | 75227 | No value stated | RESIDENTIAL PLUMBING AND GAS INSTALL | |||
| Oct 9, 2026 | Plumbing | 2201 WOLF ST | 75201 | No value stated | water heater 50 gal | |||
| Oct 9, 2026 | Plumbing | 9006 SANTA CLARA DR | 75218 | No value stated | New plumbing for a two-story addition to an existing single family including a new attached garage6- Lavatories 4- Toilets 1- Kitchen sink 1- Laundry 1- Regular tub 2- Shower pan liner 1- Freestanding tub 1- Tankless water heater 2- Hose bibs Gas, Sewer and Water services | |||
| Oct 9, 2026 | Plumbing | 7164 HELSEM BEND | 75230 | No value stated | REPLACE 50 GAL GAS WH | |||
| Oct 9, 2026 | Plumbing | 3150 JUBILEE TRL | 75229 | No value stated | INSTALLING ALL PLUMBING FOR NEW CONSTRUCTION | |||
| Oct 9, 2026 | New construction | 13639 INDIAN WELLS RD | 75253 | No value stated | NSFAA-NEW HOUSE, VALUE $130,000. ONE STORY, LIVING AREA 2,425. SQ FT; GARAGE 431. SQ FT; COVERED PATIO 411. SQ FT; PORCH 63. SQ FT; TOTAL CONSTRUCTION 3,330. SQ FT | |||
| Oct 9, 2026 | New construction | 5711 VAN WINKLE BLVD | 75235 | No value stated | NSFAA WE WILL DEMO A SINGLE FAMILY HOME AND REPLACE IT WITH A NEW CONSTRUCTION DUPLEX. |
| ||
| Oct 9, 2026 | New construction | 9907 BRIERWOOD LN | 75217 | No value stated | NSFAA New Home Build | |||
| Oct 9, 2026 | New construction | 8914 SAN LEANDRO DR | 75218 | No value stated | NSFAA NEW RESIDENTIAL CONSTRUCTION | |||
| Oct 9, 2026 | New construction | 10111 LANEYVALE AVE | 75217 | No value stated | RSVP-This is a residential new construction project consisting of a 1,356-square-foot house, a 44-square-foot front porch, and a 25-square-foot rear porch. The site improvements include a 280-square-foot concrete parking pad, and 221.6 square feet of concrete walkways.As part of the new construction, the project also includes the demolition of the existing damaged City sidewalk and its replacement with 877.46 square feet of new concrete sidewalk. | |||
| Oct 9, 2026 | New construction | 406 KIRKWOOD DR | 75218 | No value stated | NSFAA | |||
| Oct 9, 2026 | New construction | 11023 PINOCCHIO DR | 75229 | No value stated | NSFAA-Proposed construction of a 6,441 SF, two-story single-family residence with conventional wood-frame construction. The exterior will feature predominantly stucco on the front elevation and board-and-batten siding on the side and rear elevations. The roof will be finished with asphalt shingles. |
| ||
| Oct 9, 2026 | New construction | 3742 DUNHAVEN RD | 75220 | No value stated | NSFAA New Construction SFH \| 3742 Dunhaven Rd | |||
| Oct 9, 2026 | New construction | 601 S GLASGOW DR | 75223 | No value stated | NSFAA-new construction home 4500 sq ft with detach garage | |||
| Oct 9, 2026 | New construction | 12371 SWAN LAKE PKWY | 75230 | No value stated | NSFAA Proposed new single family construction. |
|